CGET, An internationally-known brand for brewery equipment and package line
CE Certificate Beer Filling Machine Beer Bottling Line AC220V Or AC380V
1. Relevant description
Relevant data of the line:
Project name: Beer bottling line
Basic profiles:
Liquid | Bottle type | Bottle volume | Label type | Caps type |
Beer | Glass bottles | 500ml, 330ml | Glue labels | Crown caps |
Note:
The final equipment size and type should be adjusted according to the fixed product.
All the machines are designed according to the buyers can and bottle size.
This line might be able to treat other sizes, though the relative machines should add necessary parts or change to
different design. The undetermined details should be provided to the seller.
The relevant technical parameters and machine design should be finally confirmed after the estimate of seller, receiving all the details and samples.
1. Equipment list
NO | Name | Model | Qty | Capacity |
Filter machine | ||||
1 | Vane-type diatomite filter | GD-GL | 1 | 5T |
Beer keg washing/filling machine line | ||||
1 | Beer keg washing machine | GD-QX-02 | 1 | 70-140kegs per hour |
2 | Beer keg filling machine | GD-GZ-02 | 1 | 70-140kegs per hour |
3 | Beer keg washing and filling 2-1 unit machine | GD-QG-01 | 1 | 60kegs per hour |
Beer bottling line | ||||
1 | Beer glass bottle washing, filling and capping 3-1 unity machine | GD-GZF-16166 | 1 | 1000-3000BPH |
2 | Pasteurizer | GD-SJ-3000 | 1 | 3000BPH |
3 | Dry Machine | GD-FG-2 | 1 | 3000BPH |
4 | Automatic labeler machine | GD-TB | 1 | 3000BPH |
5 | Coding Machine | GD-PM | 1 | 3000BPH |
6 | PE shrink packing machine | GD-MB | 1 | 3000BPH |
7 | Man light detector | GD-DJ | 3 | 3000BPH |
Note:
Price term: EXW Jinan, China
Payment: 50%TT in advance, 50%TT before shipment.
Delivery: 20 working days.
The above quotation is based on the machines, not include the conveyors.
Valid time: within 20 days
Aftersales service:
We guarantee the quality of the main parts within 12 months. If the main parts go wrong without
artificial factors within one year, we will freely provide them or maintain them for you. After one year, ifyou need to change parts, we will kindly provide you with the best price or maintain it in your site.
Whenever you have technical question in using it, we will freely do our best to support you.
Installation and training:
We provide training for free if the technical engineers of the buyer come to our company. If the buyer needs our engineer to install and training at buyer's spot, the buyer should pay for the visa cost, air ticket, and accommodation and salary, etc.