Small Commercial Brewing Equipment Mini Brewery Plant Electrical Or Steam
Mash/Lauter tank
1. Material: SUS304
2. Total volume:300L, effective volume:200L;Conical head
3. Thickness of insulating layer:80mm;
4. Inner Body Thickness: 3mm.
5. With cleaning ring, top CIP spray 2 balls
6. TOP mechanical agitation: cycloidal reducer;
7. Milled plate false bottom :4mm
8. The manhole with sight glass
9. Thermowell tube with PT 100 temperature probe;
10. Ribbon polished for the welded place;
11. With Liquid meter
12. Condensate water pipe
13. Three legs with brace and adjustable bolt;
14. Necessary fittings and valves.
Decorative tube
LED Sight light
Digital display gauge
Kettle/ Whirlpool tank
1. Material: SUS304
2. Effective volume:200L;Conical head
3. Electrical coil heating,power 10 kw
4. Condensate water pipe
5. Thickness of insulating layer: 80mm;Rock wool
6. Inner Body Thickness: 3mm.
7. Top two CIP Spray balls
8. Ribbon Polished on welds
9. The manhole with sight glass;
10. Thermowell tube with PT 100 temperature probe;
11. with Liquid meter
12. Three legs with brace and adjustable bolt;
13. With tangent line
14. Necessary fittings and valves.
Decorative tube
LED Sight light
Digital display gauge
1. Q: Are you a manufacture?
A: Yes, we’ve been in producing, exporting and installing brewery equipment for 21 years.
2. Q: Have you sold equipment to our country before? Which brewery is it?
A: We have 600+ world-wide customers, covering every continent. With your detailed request of brewery,
we’ll provide you contacts for calling and visiting our successful brewery projects.
3. Q: What kind of equipment should I choose?
A: With knowing your expected beer output & brewery area dimension, we will choose the most appropriate equipment for you.
4. Q: Is customize available?
A: Sure, and that’s the spirit of craft beer brewing: multy-possibilities & being unique.
5. Q: Will I get design or solutions for my brewery?
A: Definitely, we design brewery layout for every client. Further more, beer recipes and brewing tutoring if needed.
6. Q: How should I install the brewery?
A: You will get our full and accurate online guidance, including video, picture instruction, etc. If you need a paid installation service, our experienced technicians will handle the whole process as a turnkey project.
7. Q: Is your system manual or automatic?
A: All the electric devices are controlled by PLC system. It’s semi-auto on brewhouse and full-automatic on fermentation. You can read all status of brewing on the screen/gauges.
8. Q: How should I pay?
A: After signing contract, 30% by T/T in advance and balance before shipment.
9. Q: How long does the production take?
A: Generally 30 working days since receipt of down-payment.
10. Q: What about quality warranty?
A: We provide 5 years warranty for main equipment, and 1 years for electric devices.