Tower Crane Anti-Collision System Luffing Topkit Potain Liebherr Zoning
Highlight
Tower crane Anti-collision, Zone protection system, Load moment indicator.
- The latest multifunctional safety system, integrated Load Moment Indicator, Anti-collision & Zone Protection System and remote online monitoring system.
- Visible 10 inch LCD touch screen display, show the most comprehensive working states of tower crane in operation.
- Friendly man-machine interface; automatically generated the coordinates of Tower crane & Obstacle, and Tower crane off-line protection (Optional)
- Strict high and low temperature test, anti-fouling and anti-corrosion.
- Higher integration greater precision data acquisition; Stable, convenient, long service life of system;
- Video manual, Easy for installation and calibration;
Working Temperature: | -10℃~60℃ |
Working Humidity: | ≤95% (25℃) |
Power supply: | AC170~240v (Customized as requirement) |
Working mode: | Continuous |
Frequency rang: | 223.000 to 235.000 Mhz (Customized) |
Transmitter power: | 1-10w |
Transmission distance: | ≥10km (*Transmitter power 10W) |
Overall error: | ≤±3% |
Load cell linear error: | ≤±0.5% |
Anti-collision
- Real-time monitoring Tower crane working conditions prevent collision risk of each parts, ensure the stop within functional distance setting.
- Up to 30 Tower cranes management by radio transimmission.
- Automatically generated the coordinates of Tower crane.
- Tower crane off-line protection (Optional)
Zone protection
- Minimum 3 points from one obstacle to indicate a protection zone.
- Automatically generated the coordinates of obstacle
- Up to 10 zone for one tower crane surrounding
- Independent functional Zoning distance setting
Data record
Various data of Tower crane working status can be record constantly.
- Able to generate as EXCEL file and download to USB drive
- Online supervisor is available by add-on GRPS module.
- Real-time Record: Every 5 sec continuous recording
- Working Record: Record data per every lifting.
- Anti-collision Record: Record every control of prevent collision.
- Operating Record: Record the setting of Tower crane parameter.
Safe Load Moment
- Real-time monitoring Tower crane hook Loading condition to prevent Crane accident due to overload, ensure the stop within limit per Load chart.
- Always able to upload new Load Chart by USB drive.
- Multiple load charts can be upload at one time
- Easy programming of Load chart on software of computer.