Specifications
Brand Name :
XCMG
Model Number :
XLC220
Place of Origin :
China
MOQ :
One Crane
Price :
Negotiable Price
Payment Terms :
L/C,T/T
Supply Ability :
Supply According to Customer Needs
Delivery Time :
According to Order Confirmation
Packaging Details :
Packing According to Customer Requirements
Capacity :
220 tons
Max Lifting Height :
60 meters
Safety Features :
Load Moment Indicator
Counterweight :
Removable
Accessories :
Jib, Fly Jib, Hook Block
Engine Power :
300 kW
Outrigger Support :
Hydraulic
Boom Length :
40 meters
Description

The 220T Crawler Crane Has Good Performance In The Mining Field, Which Is Convenient For Construction And Easy To Use.

XLC220 Crawler Crane Technical Specifications

Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m

Typical working conditions

Main boom working condition_with boom end pulley auxiliary hook HBS/1_55t+21t main boom main hook performance

Operating radius(m)

Main boom length(m)

17

20

23

26

29

32

35

38

41

44

47

50

5

200

6

196

192

190.5

179

7

169

165

159

154

149

144

139

8

138

137

133

129

125

122

118

115

112

103

9

113

113

114

111

108

105

103

100

98.2

95.8

93.5

10

95.6

96

96.3

96.5

95.4

93.2

91

89

86.9

85

83.1

81.2

12

72.1

72.5

72.8

72.9

73

73

73

71.8

70.3

68.9

67.5

66.2

14

57.2

57.7

58

58.1

58.1

58.1

58.1

58

58

57.6

56.5

55.5

16

46.9

47.4

47.7

47.8

47.9

47.9

47.9

47.8

47.7

47.6

47.5

47.3

18

39.8

40.2

40.3

40.4

40.4

40.4

40.3

40.2

40.1

39.9

39.8

20

34.4

34.6

34.7

34.7

34.6

34.5

34.5

34.3

34.2

34

22

30

30.2

30.2

30.1

30

29.9

29.8

29.7

29.5

24

26.3

26.5

26.5

26.5

26.4

26.3

26.1

26

25.8

26

23.4

23.4

23.4

23.3

23.3

23.1

23

22.8

28

20.9

20.9

20.8

20.7

20.6

20.4

20.3

30

18.7

18.6

18.5

18.4

18.3

18.1

32

16.8

16.7

16.7

16.5

16.4

16.2

34

15.1

15

14.9

14.8

14.6

36

13.6

13.5

13.3

13.2

38

12.2

12

11.9

40

11

10.9

10.7

42

9.9

9.7

44

8.8

Magnification

18

18

16

14

13

12

11

10

9

9

8

8

Notes:

1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

Main boom working condition_with boom end pulley auxiliary hook HBS/1_55t+21t main boom main hook performance

Operating radius(m)

Main boom length(m)

53

56

59

62

65

68

71*

74*

10

79.7

78

76.3

68.5

12

65.2

63.9

62.7

61.4

60.2

59.1

57.8

14

54.7

53.7

52.7

51.7

50.7

49.9

48.9

47.2

16

46.9

46

45.2

44.4

43.5

42.9

42

40.6

18

39.9

39.8

39.3

38.6

37.9

37.3

36.5

35.3

20

34.2

34

33.9

33.7

33.3

32.8

32.1

31.0

22

29.7

29.5

29.3

29.1

28.9

28.8

28.4

27.5

24

26

25.8

25.6

25.4

25.2

25.2

24.9

24.5

26

23

22.8

22.6

22.4

22.2

22.1

21.9

21.6

28

20.4

20.2

20.1

19.9

19.6

19.6

19.3

19.0

30

18.2

18.1

17.9

17.7

17.5

17.4

17.1

16.9

32

16.4

16.2

16

15.8

15.6

15.5

15.2

15.0

34

14.7

14.6

14.4

14.2

14

13.9

13.6

13.3

36

13.3

13.1

13

12.8

12.5

12.4

12.2

11.9

38

12

11.9

11.7

11.5

11.3

11.2

10.9

10.6

40

10.9

10.7

10.5

10.3

10.1

10

9.8

9.5

42

9.9

9.7

9.5

9.3

9.1

9

8.7

8.5

44

8.9

8.8

8.6

8.4

8.2

8.1

7.8

7.6

46

8.1

7.9

7.8

7.6

7.3

7.2

7

6.7

48

7.2

7

6.8

6.6

6.5

6.2

6.0

50

6.4

6.3

6.1

5.9

5.8

5.5

5.3

52

5.6

5.4

5.2

5.1

4.9

4.6

54

4.8

4.6

4.5

4.3

4.0

56

4.1

4

3.7

3.5

58

3.5

3.5

3.2

3.0

60

3

2.7

2.5

62

2.3

2.0

Magnification

7

6

6

6

5

5

5

4

Notes:

1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

Send your message to this supplier
Send Now

Construction Crawler Crane 220tons For Mining Field / Hydraulic Lattice Crawler Crane

Ask Latest Price
Watch Video
Brand Name :
XCMG
Model Number :
XLC220
Place of Origin :
China
MOQ :
One Crane
Price :
Negotiable Price
Payment Terms :
L/C,T/T
Contact Supplier
video
Construction Crawler Crane 220tons  For Mining Field / Hydraulic Lattice Crawler Crane

Shandong Tengfei Hoisting Engineering Co., Ltd.

Verified Supplier
1 Years
shandong, zibo
Since 2015
Business Type :
Distributor/Wholesaler, Exporter, Trading Company, Seller, Other
Main Products :
, ,
Total Annual :
1000-5000
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement