Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m
Tower jib working condition
Main boom section combination for tower type jib working condition
Name and quantity
Main boom length |
Main boom bottom section 9m |
Intermediate section 3mA |
Intermediate section 6mA |
Intermediate section 12mA |
Transition section 6m |
Intermediate section 3mB |
Intermediate section 6mB |
Intermediate section 12mB |
Main boom top section 5m |
HB23 |
1 |
1 |
0 |
0 |
1 |
0 |
0 |
0 |
1 |
HB26 |
1 |
0 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
HB29 |
1 |
1 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
HB32 |
1 |
0 |
0 |
1 |
1 |
0 |
0 |
0 |
1 |
HB35 |
1 |
1 |
0 |
1 |
1 |
0 |
0 |
0 |
1 |
HB38 |
1 |
0 |
1 |
1 |
1 |
0 |
0 |
0 |
1 |
HB41 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
1 |
HB44 |
1 |
0 |
0 |
2 |
1 |
0 |
0 |
0 |
1 |
HB47 |
1 |
1 |
0 |
2 |
1 |
0 |
0 |
0 |
1 |
HB50 |
1 |
0 |
1 |
2 |
1 |
0 |
0 |
0 |
1 |
HB53 |
1 |
1 |
1 |
2 |
1 |
0 |
0 |
0 |
1 |
HB56 |
1 |
0 |
0 |
2 |
1 |
0 |
0 |
1 |
1 |
Jib section combination for tower jib working condition
Name and quantity
Jib length |
Tower boom bottom section 1.5m |
Intermediate section 3mB |
Intermediate section 6mB |
Intermediate section 12mB |
Tower boom transition section 4.5m |
Intermediate section 3mC |
Intermediate section 6mC |
Intermediate section 12mC |
Tower boom top section 3m |
W18 |
1 |
1 |
1 |
0 |
1 |
0 |
0 |
0 |
1 |
W21 |
1 |
1 |
1 |
0 |
1 |
1 |
0 |
0 |
1 |
W24 |
1 |
1 |
1 |
0 |
1 |
0 |
1 |
0 |
1 |
W27 |
1 |
1 |
0 |
1 |
1 |
1 |
0 |
0 |
1 |
W30 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
1 |
W33 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
1 |
W36 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
0 |
1 |
W39 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
W42 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
1 |
1 |
W45 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
1 |
W48 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
1 |
1 |
*W51 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
*W54 |
1 |
1 |
1 |
1 |
1 |
0 |
0 |
2 |
1 |
*W57 |
1 |
1 |
1 |
1 |
1 |
1 |
0 |
2 |
1 |
*W60 |
1 |
1 |
1 |
1 |
1 |
0 |
1 |
2 |
1 |
*W63 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
2 |
1 |
Note:1. “*” tower arm length requires the use of waist rope.
2.Each boom section needs to be installed with a tower arm back plate, and the top section of the main boom needs to be installed with a tower arm guide pulley.
3.When the combined length of the main boom + tower arm exceeds 71m, it is recommended to use an inclined wedge to assist the arm raising.
Tower jib working condition (HW) jib raising table (counterweight combination 85t+30t)
Main boom
Tower Jib |
HB23 |
HB26 |
HB29 |
HB32 |
HB35 |
HB38 |
HB41 |
HB44 |
HB47 |
HB50 |
HB53 |
HB56 |
W18 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W21 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W24 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W27 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W30 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W33 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W36 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W39 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W42 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
W45 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
W48 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
*W51 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
*W54 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
*W57 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
*W60 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
*W63 |
● |
● |
● |
● |
● |
● |
● |
● |
● |
● |
× |
× |
Note:1.When raising the boom, please place the track drive wheel behind the vehicle body.
2."●" - the boom can be raised, "×" - the boom cannot be raised, and the working condition cannot be used. 3. "*" - the tower jib length requires a waist rope.
4.For the combination of the main boom and the tower jib with a total length of more than 71m, if conditions permit, it is recommended to use a wedge to assist the boom raising to ensure safer raising and lowering of the boom.