Project Name | 0.3Nm3/d coal bed gas liquefied peak adjustment project |
Enduser | Jinxibei Natural gas Co., Ltd., Shanxi province |
Construction scale | 3sets 10×104Nm3/d liquefied natural gas plant |
Liquefied process | Mixed cooling process with precooling |
Process power consumption per cubic | 0.433KWH/NM3 |
Coolant compressor | Screw compressor, 3pcs, motor driven |
Area occupied | 127.3 Acres |
Construction period | 14 months |
Location | Dacha Town Wuzhai County, Yizhou, Shanxi province |
Process introduction | Five kinds of Hydrocarbon such as N2, Methane, Ethylene, Propane, Isopentane are used as mixing coolant, Freon as precooling system coolant. The feed gas goes to liquefied cold box for heat exchanging with coolant after purifying. The LNG product is stored in storage tank. |
A bird's-eye view of liquefaction plant
Typical Reference List
List of References in LNG (CNASEC).pdf
Our Strength
CNASEC has its own engineering & technical team, that professional and with rich experiences. The professional and technical personnel account for 93% of the total number of employees, including professional level senior engineer 2 people, all kinds of national registered engineer 65 people, covering majors of process, general drawing design, automatic control, electric, architecture, structure, civil engineering, sewage engineering, procurement, construction management as well as project budgets etc..
To date, CNASEC has established over 30 projects related to LNG and Ethylene etc., and been equipped with the ability of designing and developing 100,000m3-level full containment tanks. In addition, the company has successfully generalized a set of standardized systems of storage tank engineering, realizing the short-term goals of the construction period and successfully shaping the national brand image of large-scale cryogenic liquefied storage and transportation projects!
Advanced Design Software
◆ Engineering Drawing Software:AUTOCAD
◆ 3D Factory Model Real-time Roaming:NAVISWORKS
◆ Process Simulation Software:HYSYS
◆ Pipeline Stress Analysis: CESAR II
◆ Structural Analysis: ANSYS, ABAQUS, LUSAS,STAAD
◆ 3D Piping Arrangement System:PDMS
◆ Project Management Software: PROJECT