CNOOC 2.6 million tons Iran, South pars,LNG,Cold box
Project and Engineering Services, Ltd. (hereinafter referred to as SASPG) will design, manufacture and supply a brand new air separation plant using the latest process technology of molecular sieve adsorption, booster turbo expander, structured packing upper column and GOX internal compression process. The device is equipped with air filtration system, air compressor system, air pre-cooling system, molecular sieve purification system, booster turbo expander system, cold box system, LOX storage and evaporation system, instrumentation and electrical control system, etc.
Certificate
ISO9001-2008 quality system certification
Design & Manufacturing License for Class A1, A2, C2 and C3 Pressure Vessels
ASME authorization certificate, U, U2 steel seal
Design License for Pressure Pipes (GC1)
Manufacturing License for Pressure Pipe Fittings (Class AX)
CE Certification for Air Separation Plant & LNG Plant
Military quality system certification
Certification for Weapons And Equipment Manufacturing of General Equipment Department
High-tech Enterprise
Manufacturing License for B3 Cylinder
Wind tunnel test
Precooling Heat Exchanger (Stage IV Propane Precooling):
Quantity: 4 single row cold box, 8 in total;
1100×1789×8000mm
Liquefaction Heat Exchanger:
Quantity: 4 single row cold box, 8 in total;
1250×2350×8000mm
Sub-cooling Heat Exchanger:
Quantity: 2 single row cold box, 4 in total;
1000×1350×4200mm