Steel structure building is a new type of building structure system, which is mainly composed of H-shaped steel, Z-shaped steel, U-shaped steel and other steel components connected as the main steel skeleton. At the same time, it is also equipped with a walking crane, and the roof and wall are made of various panels, and are matched with windows, doors, cranes and other components.
Steel structure buildings are widely used, covering workshops, warehouses, garages, garden storage sheds, air fences, office buildings, apartments and other construction scenarios, and are also suitable for various steel structure buildings, metal buildings, modular houses, and other riveted and welded steel frames.
It is worth mentioning that the size of the steel structure building can be customized according to the specific requirements of customers to meet the diverse construction needs.
classify | Material Name | Specification Description |
main steel frame | H-shaped steel | HN300×150×6.5×9 |
main steel frame | Z-shaped steel | The thickness is between 1.5 - 3mm. |
Main steel frame | U-shaped steel | The size is customizable. |
Roofing and wall materials | Roofing panels | The thickness is generally between 0.4 - 0.8mm. |
accompanying equipment | walking crane | Selection based on parameters such as lifting capacity, span, etc. |
Advantages of steel structure
High strength and strong bearing capacity
Steel construction materials, such as H-beams, Z-beams, and U-beams, have excellent strength. In the case of H-beams, for example, their unique cross-sectional shape makes them excellent under pressure and tension, effectively taking on the main load-bearing tasks of buildings, ensuring that they are stable and able to cope with various natural disasters such as earthquakes and strong winds.
Lightweight and reduced base cost
Despite its high strength, steel structural materials are lighter in weight than other traditional building materials, such as concrete. This not only reduces the load on the building itself, but also reduces the requirements on the building foundation, thereby reducing the cost of infrastructure construction, while also facilitating the transportation and installation process.
It is convenient to process and install, and shortens the construction period
The steel structure materials can be standardized in the factory, with high precision and stable quality. When installed on site, it only needs to be assembled by welding, riveting, etc., and the construction speed is fast, which greatly shortens the construction period of the building and improves the construction efficiency of the project.
Adaptable to meet diverse needs
Whether it is supporting equipment such as walking cranes, or various panels of roofs and walls, as well as auxiliary components such as doors and windows, steel structure materials can be well adapted to them. At the same time, its size and specifications can be customized according to different architectural design requirements, which can meet various complex and diverse architectural needs, providing greater flexibility for architectural design.
What we can offer you
Professional design team: The company has a professional design team composed of senior structural engineers and architectural designers, who have profound professional knowledge and rich practical experience, are familiar with the design specifications and standards of various steel structure buildings, and can provide all-round and personalized design solutions according to the different needs of customers, from building functions, space layout to appearance modeling.
Standardized production process: In the factory production process, we follow a strict standardized production process and adopt advanced automated processing equipment, such as CNC cutting machines, CNC drilling machines, etc., to ensure the processing accuracy and quality stability of each component. At the same time, establish a sound quality inspection system, strictly inspect each process in the production process, and unqualified products will never flow into the next process to ensure that every component of the factory meets high quality standards.
Professional transportation plan: for different sizes and weights of steel structure components, develop personalized transportation plans. Professional transportation equipment and protective measures are adopted, such as special transportation racks, lashing belts, cushioning materials, etc., to ensure that the components are not damaged during transportation. At the same time, we should reasonably plan transportation routes, optimize transportation plans, reduce transportation costs, and provide customers with efficient and economical transportation services.
Company Profile
Shandong Chentai Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for steel structure design, manufacture and installation. We have estabulished over 15 years. Our factory is covering about106,5 60 square meters.
Main products: steel structural warehouse, workshop, high rise steel building, school, hotel,office building, exhibition building, show room, shopping mall, stadium,Agricultural project (stable/cattle barn, poultry house,pig house), car parking, hangar,shed,storage room, prefab house, container house, Sandwich panel,corrugated steel sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the container when clients received they can pulling them out within half an hour. It can help our clients to save a lot of time and labor cost during unloading.
Container loading; We will supply the materials list, the packing lists based on the contents we loaded into container. Showing the quantity, part no. length, container no, seal no.after finishing the container loading.
"Quality and service first "is our company's development goals. We hope we will develop together and win more projects together!
Packaging & Shipping
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
FAQ