Product description
MPO OM3 MTP/MPO 12 Strand Multimode Fiber Optic Cable Patch Cord
GEZHI Photonics manufactures data center grade fiber optic MPO patch cords. The MPO connector uses a spring loaded sliding mechanism allowing the fiber patch cord to latch onto adapters providing a secure and reliable connection for network cabling in enterprise data centers, backbone, colocation facilities, server farms, cloud storage networks, and telecommunication rooms. Each assembly is 100% factory tested to meet IEC 61753-1 standard.



Applications
Data Center
Optical System Access network
Storage area networking
40GbE & 100GbE protocol
Specification
1. Custom Fiber Count
8 Fibers used for 40G/100G QSFP+/QSFP28 direct connection. | 12-144 Fibers used for 10G/40G/100G high-denisty structural fiber cabling. |
 |  |
2. Custom Polarity
There are also three different types of MPO cables – Type A, Type B and Type C as below pictures:

3. Custom Connectors
Male (with pins) The male connector is mated to the female side for adapters, cassettes or panels connection. | Female (without pins) The female connector can be directly connected to transceivers or other male connectors. |

Specifications
Performance Level | Standard | Elite |
Connector | Mode | Endface | IL(max) (dB) | RL(min) (dB) | IL(max) (dB) | RL(min) (dB) |
MPO/MTP | MM OM3 | 8F/APC | ≤0.50 | ≥20 | ≤0.35 | ≥20 |
12F/APC | ≤0.50 | ≥20 | ≤0.35 | ≥20 |
24F/APC | ≤0.50 | ≥20 | ≤0.35 | ≥20 |
8F/PC | ≤0.50 | ≥20 | ≤0.35 | ≥20 |
12F/PC | ≤0.50 | ≥20 | ≤0.35 | ≥20 |
24F/PC | ≤0.50 | ≥20 | ≤0.35 | ≥20 |
Product line



Packing & Delivery

AFQ
Q1:About the price?
A1:We usually quote within 12 hours after we confirm the technical data of your products.
Q2: What's the payment method?
A2: We accept L/C,T/T,Western Union,MoneyGram,PayPal etc.
Q3: What are your terms of payment?
A3: 30% in advance,and 70% before shipment
Q4: How to ship the items to me?
A4: Courier(DHL,TNT,FEDEX,UPS,EMS),Airfreight,Ocean Ship are available.
Q5: How long is your delivery time?
A5: The general delivery time is 5-7 days after order confirmed,it depends on the order quantity.