OM457 diesel engine forged steel crankshaft 4570300401 model engine crankshaft
OM457 diesel engine forged steel crankshaft 4570300401 model engine crankshaft Our Super High Quality cast iron crankshaft is made by pouring molten iron into a mould. Forged crankshafts are used in some performance engines. A forged crankshaft is made by heating a block of steel until red hot, and then using extremely high pressure to form it into shape.
Application | Cummins Diesel Engine |
Material | Genuine Original Cummins |
Delivery term | FOB,CIF,CFR |
Package | Neutral packing or as customer requirment |
Warranty | 6 month |
After Our crankshaft has been forged or cast, its journals and bearing surfaces are machined perfectly smooth.
Oil passageways, or oilways, are drilled.
Performance engines will machine every part of the crankshaft to reduce oil drag
The journals must be harder than their bearings to ensure that any wear occurs on the replaceable bearings and not the crankshaft, which should last for the lifetime of the engine. The manufacturing process will include hardening of these areas through nitriding or heat treatment
using high quality raw material and latest machinery by our experts. in all types of engines and parts for buses, trucks, construction machinery, generator sets, and marine vessels. The genuine diesel engines and Engine Spare parts, including Gearbox, such as Crankshaft, piston ring, cylinder liner, piston, parts Group and so on
Packing Details : Wood case, 1set/carton
Delivery Details : 3~10 days after received deposit
Delivery way: By air or sea or by express, or sent to your shipping forwarder in China
Parts OM457 diesel engine forged steel crankshaft 457030040
Q1. What's quality of the goods you can provide?
A: Genuine parts from the original factory directly; OEM parts from the OEM factory, And aftermarket with
high quality from reliable factory.
Q2.What's your packing?
A: Usually We pack our goods in neutral white boxes and brown cartons.
We can accept client's brand boxes after get authorization letters.
Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show the photos of the products and packages
before delivery.
Q4. What is your terms of delivery?
A: EXW, FCA, FOB, CFR, CIF, DDU.
Q5. How about your delivery time?
A: Generally, it will take 15 to 30 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.