Thermal shock test chamber is used to test products in alternating extremes of high and low temperatures in order to observe changes in product characteristics and failure occurrence.
QT3 series air-to-air thermal shock chambers circulate cold, hot, or ambient air as needed. The conditioned air is pre-cooled or pre-heated beyond the set point, allowing quicker recovery of the desired condition after transfer.
QT3 Series Chambers Conform Following Testing Standards:
※ MIL-STD-883E Method 1011.9 Thermal Shock
※ MIL-STD-202G Method 107G Thermal Shock
※ JIS C 0025 Basic Environmental Testing Procedures Part 2: Tests, Test N: Change of Temperature
※ IEC 61300-2-47:2004 Fiber Optic Interconnection devices and passive components-Basic Test and Measurement Procedures – Part 247: Tests – Thermal Shocks
※ JEDEC STANDARD JESD22-A104C Temperature Cycling
※ GB/T 2423.22-2012 Environmental testing - Part 2: Tests methods - Test N: Change of temperature
※ Others related standards and test methods: SJ/T10186-91Y73, GJB150.5, GJB360.7, GB/2423.22
Chamber Dimensions:
Model | Interior Dimension | Interior Volume | Exterior Dimension | Specimen Loading Weight |
QT3-56A/B/C | 400 ×350× 400mm | 56L | 1450× 1950 ×1600mm | 2.5Kg |
QT3-80A/B/C | 500 ×400× 400mm | 80L | 1550× 2050 ×1600mm | 5.0Kg |
QT3-150A/B/C | 600 ×500× 500mm | 150L | 1650× 2150 ×1800mm | 7.5Kg |
QT3-225A/B/C | 750 ×600× 500mm | 225L | 1850× 2250 ×1800mm | 7.5Kg |
Specifications:
Structure | Pre-cooling Zone, Pre-heating Zone, Testing Zone |
Damper Device | Forced Air Damper |
Interior Material | SUS#304 Stainless Steel |
Exterior Material | Stainless steel with environmentally baking paint |
Testing Shelves | Stainless Steel Plate |
Refrigeration | Cascade Refrigeration System |
Cooling Method | Water/Air Cooling |
Ambient Temperature | 5℃~30℃ |
Pre-heating Temperature | 80℃~200℃ |
Pre-cooling Temperature | -40℃ (-60℃/-75℃)~-10℃ |
High Temp. Shocking | 60℃~150℃ |
Low Temp. Shocking | A=―35℃~0℃ |
Temp. Uniformity | Less than ±2℃ |
Transition time | <10 seconds |
High Temp. Recovery Time | RT℃~150℃/5min |
Low Temp. Recovery Time | RT℃~-75℃/5min |
Pre-heating Time | 40min (30min for 56L) |
Pre-cooling Time | 80min (60min for 56L) |
Controller | Powerful interactive LCD touch screen controller |
Setting Range | Temperature: -200℃~300℃ |
Resolution | Temperature: 0.1℃ |
Control Method | PID+SSR |
Power supply | AC380V/50Hz/3P |
Accessories | Cable Port, LCD touch screen controller, Power cable |
Security System | Overheat Protector, Compressor overload protector, |
Note:
1. Ambient temperature of +23℃ and a cooling water temperature of +25℃
2. During pre-heating, prevention for temperature heat-up may be worked
3. Performance shown above conforms to IEC61300-2-47
4. Temperature heat-up/pull-down time is applicable only during independent chamber operation
Features:
※ Automatically setting of pro-cooled and pre-heated air.
※ Testing samples don’t move, cable port is available for power on testing.
※ Powerful interactive touch screen controller, easy operation and setting
※ High accurate temperature recovery with PID auto tuning
※ Auto defrost function