100T Double Girder Gantry Crane Wireless Remote Control Span Customization
Introduction:
The gantry crane runs on the track laid on the ground, and the lifting weight ranges from 5 tons, 10 tons, 16 tons, 20 tons to 600 tons.
LH type electric hoist double-girder gantry crane has a hoisting trolley on its double main girder, the electric hoist is fixed on the hoisting trolley, the hoisting mechanism is an electric hoist, and the working level is more A3.
MG type hook double-girder gantry crane is divided into A type and U type, which belong to the lifting trolley hook type, and can be divided into full flower frame type and all-inclusive box type. The lifting capacity is from 10 tons to 50/10 tons. Its track is generally heavy rail, and the working level is A5. The lifting mechanism is the reducer, motor, reel, brake, electrical appliance, etc. on the lifting trolley. hook.
Technical Parameter:
Load Capacity (ton) | Span /Rail Gauge (m) | Max. Lifting height (m) | Duty Class |
10 | 15~35 | 3~25 | A5 or A3 |
16 | 15~35 | 3~25 | A5 or A3 |
20 | 15~35 | 3~25 | A5 or A3 |
32 | 15~35 | 3~25 | A5 or A3 |
36 | 15~35 | 3~25 | A5 or A3 |
40 | 15~35 | 3~25 | A5 or A3 |
50 | 15~35 | 3~25 | A5 or A3 |
Customizable | Customizable | Customizable | Customizable |
Product Configuration:
1.Double box beam with steel legs moving through the ground beam as crane travelling system
2.The camber of main beam will be designed as Span*1-1.4/1000.
3.Steel Material: Q235 or Q345
4.Shot-blasting Sa2.5 for main girder and supporting beam
5.Epoxy zinc rich high quality painting.
6.Electrification and outfitting
7.Brand: CHINT SIEMENS Schneider
8.Conductor power supply: Cable Reel or busbar.
How to choose:
1. Selection of gantry crane
2. Span and cantilever length
3. The principle of determining the wheelbase
4. The gantry crane spacing size is determined
Photo: