200t Beam Launcher Bridge Erection Crane Equipment To Move Girder
Product Description
200t Beam Launcher Bridge Erection Crane Equipment To Move Girder is a kind of steel structure prefabricated beam hoisting erection equipment with wide working range, good performance, easy operation and safe structure. Main structural features the main beam adopts the four-sided truss structure, which is made of sections and steel plates welded together. It is suitable for highway construction in mountainous area and can meet the requirements of large slope, small radius curved bridge, 45 degree inclined bridge and bridge erection at tunnel mouth. Similarly, it is more convenient in the plain where the construction conditions are good. This product is used in -20℃- 40℃, no fire and no corrosive medium environment.
Product Advantages
- Novel in form and reasonable in structure, the machine has fully considered the construction characteristics of modern Bridges in the design, so that the machine has a wider adaptability;
- The whole machine is light in weight and high in stiffness. Finite element analysis and calculation are adopted in the design of the machine to optimize the structure, so that the weight of the whole machine can be reduced by 20%-30% compared with similar models.
- 200t Beam Launcher Bridge Erection Crane Equipment To Move Girder adopts the form of guide beam, which greatly reduces the cantilever deflection of the front end of the bridge erecting machine and is more suitable for erecting the upper and lower slope Bridges;
- The middle leg does not walk on the bridge deck, so there is no need to lay the longitudinal track of the bridge erecting machine. At the same time, the pressure of the bridge erecting machine on the bridge deck is reduced.
- Transport beam flat car participate in the bridge erecting machine walk, become a part of the bridge erecting machine, the bridge erecting machine rent, so that the overall length of the bridge erecting machine reduce, bridge erecting machine has greater adaptability to curved bridge;
- The position of the front and middle legs of the bridge erecting machine can be adjusted at will. The position of the front and middle legs of the bridge erecting machine can be adjusted according to the Angle of the oblique bridge when erecting the bridge;
- The side beam is in place once and the trolley is moved horizontally. The whole machine carries the side beam to be in place once and solves the installation problem of the side beam.
- The main beam and main connection structure of the whole machine adopt pin shaft connection, which is convenient for installation and disassembly
Package & Delivery
