Specifications
Brand Name :
TECHCORE
Model Number :
RDS510004
Certification :
ISO, BV
Place of Origin :
China
MOQ :
1 set
Price :
Negotiable
Payment Terms :
T/T, L/C
Supply Ability :
10 SET/MONTH
Delivery Time :
30 DAYS
Packaging Details :
Polly wood, suitable for sea and air shipment
Application :
Open Hole Drill Stem Testing
Type :
MFE Packer Test
Working Pressure :
15000 psi
Tool Size :
5 inch
Connection :
IF Box X Pin
Working condition :
H2S above 175oF
Material :
AISI Alloy Steel
Package :
Polywood Case
Description

Multi Flow Evaluator Downhole Packer Test Equipment Corrosion Resistance


Introduction of Open Hole MFE Test

In order to illustrate the working of the MFE system of tools, a complete operation will be described in which a step by step sequence of a MFE test is included to relate the position of the tool to the effect of the well bore and formation, Figure will be used for illustration.

Specification of Open Hole Multi-Flow Evaluator

MFE Size Valve Area Sample Chamber Capacity
5-3/4″ 4 in .² 2500㏄
5″ 4 in .² 2500㏄
4-1/4″ 2 in .² 2000㏄
3-3/4″ 1.5 in .² 1000㏄
3-1/8″ 1 in .² 1000㏄



Constructure of Open Hole Multi-Flow Evaluator

The MFE consists of three basic sections: indexing, delay, and sampling. Each of these sections will be described in detail below.

OPERATING INSTRUCTIONS

Description of a Single Packer Test

The string is run in the hole with the MFE closed to prevent drilling fluid from entering the drill stem. The MFE By-Pass is locked open, allowing fluid to by-pass through the Full Bore Casing Packer to the annulus.

To close the MFE for a shut-in, the drill stem is lifted approximately 2,000 pounds tension is applied against the MFE (following a free-point on the rig weight indicator) and then lowered to apply weight back on the system. The MFE Hydrostatic Bias prevents the by-pass from opening and helps keep the packer set during this lifting operation. For detailed discussion of the bias see the section entitled “Operation Loads”. When closing the MFE testing valve, no “drop” or “fall” of the drill pipe occurs, which is an indication that the valve is closed.

To re-open the MFE for a flow period the drill stem is again lifted until approximately 2,000 pounds tension is applied (following a free-point on the rig weight indicator) and then lowered. After a time delay, a one inch free fall will again give an indication that the tool is open.


Multi Flow Evaluator Downhole Packer Test Equipment Corrosion Resistance


Techcore Oil Tools expertise in manufacture of the Drill Stem Testing Tools for more than Ten years, the professional Reserch and Development (R&D) department improves the advanced technology in design of the Drill stem testing tools for well testing service.

* Techcore insist on superior quality, strong packing & timely delivery.

* Third party inspection is available from SGS, BV, DNV etc.

* Techcore do the best to supply thoughtful and prompt after-sales service to guarantee for the customers' benefits

* Techcore supply the cost effect products with 12 months guarantee

We approach every client’s enquiry with meticulous attention to technical specifications, and a high level of appreciation for their urgency.

Welcome to contact us for more information about our tools and service!

Send your message to this supplier
Send Now

Multi Flow Evaluator Downhole Packer Test Equipment Corrosion Resistance

Ask Latest Price
Brand Name :
TECHCORE
Model Number :
RDS510004
Certification :
ISO, BV
Place of Origin :
China
MOQ :
1 set
Price :
Negotiable
Contact Supplier
Multi Flow Evaluator Downhole Packer Test Equipment Corrosion Resistance
Multi Flow Evaluator Downhole Packer Test Equipment Corrosion Resistance

Techcore Oil Tools Co.,Ltd,

Verified Supplier
7 Years
Since 2014
Business Type :
Manufacturer, Exporter
Total Annual :
5Million-10Million
Employee Number :
>100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement