China Luxury magic toilet sink drain pipe cleaner powder
How to use
1. According to the degree of blockage, take out an appropriate amount of product and pour it into the plastic bottle cap
2. Pour the dredge into the sink, wait for 1-2 minutes, pour 500ML hot water, please pay attention to protection at this time, do not touch the skin
3. Wait about an hour and rinse with plenty of water
Products Name | Pipeline Drain Cleaner |
Shape | Powder |
OEM | Accepted |
Lead Time | 7-10 days |
Transport Method | Express delivery, by air, by sea |
Guarantee period | 5 years (without opening the package not) |
Precautions | Don't eat it or let it touch eyes or any sensitive part of your skin. In case of its accidental entry into your mouth,please use much clean water to flush, or go to the doctor's. The product shall be stored in a shady dry place unexposed to the sun. |
Dacheng Yuhao Sanitary Ware Co., Ltd. was established in 2010. It is a professional manufacturer of drainage cleaners, anti-mosquito liquids and drainage cleaner powders integrating R&D, production, sales and service. In recent years, the company has introduced a series of professional production equipment such as automatic labeling machines, automatic filling equipment, automatic packaging equipment, and automatic inkjet printers. And passed the ISO9001 and CE certification. The products sell well in the domestic market and are exported to Southeast Asia, the Middle East, Africa and Europe and the United States. We welcome OEM and ODM orders.
FAQ
1. Do you accept OEM/ODM?
A: We do professional OEM/ODM service for more than 4 years.
2.: Are you a factory or a trading company?
A: We are a detergent factory with export license
3: Do you provide samples? Is it free or extra?
A: Yes, we provide free samples, but the courier cost is borne by you.
If the product is custom, a fee will be charged based on the complexity of the requirement.
4: When can I get the price?
A: Reply emails within 24 hours. Feel free to add Whatsapp to contact us
5: How soon can I get the samples?
A: Stock samples are within 2 working days, but custom one takes 5 working days.
6: What is the lead time for mass production?
A: About 15-25 working days after receiving the deposit.