Piling Foundation Bauer Double Wall Casing With Joints And Connections
Casing is used to minimize loosening of the soil structure around the pile during the drilling process.
Casing tubes have the function of cutting the soil structure with a casing shoe,to support the bore hole temporarily,and by preceding the excavation,to forestall loosening of the ground structure.
Casing tube is different from temporary casing, according to its structure can be divided into single-wall casing and double-wall
casing; according to length can be divided into single section 2m, 3m, 4m casing section ect.
Feature:
1. The technical parameters and processes of the products are in line with the Bauer standard;
2. Deformation and accuracy is strictly controlled through heat treatment,each casing is interchangeable;
3. Besides Bauer,casing is also suitable for Soilmec,Casagrande and other brand;
Casing Dia. | Inner Shell THK. | Outer Shell THK. | Casing THK. | Bolts No. | Weight(3 meter) |
680-600 | 8 | 12 | 40 | 8 | 1090 |
880-800 | 8 | 12 | 40 | 10 | 1335 |
1080-1000 | 10 | 16 | 40 | 10 | 2180 |
1280-1200 | 10 | 16 | 40 | 12 | 2480 |
1600-1500 | 12 | 20 | 50 | 16 | 3910 |
2500-2380 | 16 | 25 | 60 | 18 | 7310 |
Remark : All measurements are in millimeters, weight in kilograms. |