Specifications
Brand Name :
TR Solids Control
Model Number :
TRZX-50/25
Certification :
ISO 9001:2008
Place of Origin :
Xi′an, China
MOQ :
1 set
Price :
Can be negotiated
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
50 Sets / Month
Delivery Time :
30 days
Packaging Details :
Wooden Case or by Container
Material :
Stainless Steel
Type :
Bored Pile Construction Drilling Mud System
Power Source :
Electric
Operation Pressure :
Atmospheric Pressure
System Dimension :
2300*1830*2400mm
Port :
Tianjin, Shanghai etc.
Description

Green Electric Drilling Mud System Double Layers Bored Pile Construction

Main Introduction

TR bored pile desanding plant is an economic way for the mud recycling. It is very popular for bored piling slurry treatment, HDD (trenchless) industry, TBM slurry treatment as well as water well drilling etc.

The whole equipment where mud may splash did seal or block processing, such as plasma around the pool and storage rack connection part completely sealed, which is located around the pool of slurry storage in shale shakerto increase the protective plate and prevent the machine in operation. Mud splash effectively protects the three-phase asynchronous motor unaffected by flying pulp covered its heat dissipation function, which protects the tidy of the machine.

Key Features of TR Bored Pile Desanding Plant:

  1. Effective separation of soil crusts, pore-forming efficiency is enhanced.
  2. Mud reuse saves mud making materials and reduces construction cost.
  3. High mud handling capacity, sand can be removed efficiently.
  4. The equipment for modular design and compact structure, making it easy to put in the construction and convenient to move.
  5. Mud closed-circuit circulation mode and low ballast material moisture content are helpful to reduce environment pollution.
  6. It can improve the quality and working efficiency of pore making in the pile foundation.

Technical info. of TR Bored Pile Desanding Plant

Model TRZX-50/25 TRZX-100/50 TRZX-200/50
Fluid Capacity ≤50m³/h ≤100m³/h ≤200m³/h
Sludge Treatment Capacity ≤26T/h ≤50m³/h ≤50m³/h
Separation Point 25μm 50μm 50μm
Shale Shaker TRZS753 TRZS753 TRZS705
Screen Area

Upper:700×1250

Bottom:750×900×2

Upper:700×1250

Bottom:750×900×2

Upper:750×900×2

Bottom:700×1250×3

Vibration Motor 1.0kw×2 1.0kw×2 1.5KW×2
Matching Pump TRSB4×3-12(15KW) TRSB5×4-13(30KW) TRSB6×5-13J(45KW)
Matching Hydrocyclone DN100×4 DN250×1 DN250×2
Tank Dimension 2.1x1.5x2.6m 3.05x2.0x1.2m 3.6x2.1x1.2m
Dimension 3.12x2.2x2.38m 3.7x2.2x2.54m


Green Electric Drilling Mud System Double Layers Bored Pile Construction

Product Application

TR Bored Pile Desanding Plant has demonstrated its high-performance capabilities at many job sites worldwide including the applications of bored piles construction, tunneling, micro-tunneling, pipe-jacking, piling construction and diaphragm wall construction etc. We also provide customized mud system. Welcome your inquiry and consulting!

Competitive Advantages


1. We offer high quality products at competitive price.
2. Shortest delivery time.
3. Flexible payment terms.
4. Timely after-sale service.
5. Most of our equipment can be replaceable with international brands.
6. Our products have been exported to Argentina, Egypt, US, Australia, Romania, Pakistan, Dubai, Abu Dhabi, Iran, India, Indonesia, Vietnam, Malaysia and many other countries.

Send your message to this supplier
Send Now

Green Electric Drilling Mud System Double Layers Bored Pile Construction

Ask Latest Price
Watch Video
Brand Name :
TR Solids Control
Model Number :
TRZX-50/25
Certification :
ISO 9001:2008
Place of Origin :
Xi′an, China
MOQ :
1 set
Price :
Can be negotiated
Contact Supplier
video
Green Electric Drilling Mud System Double Layers Bored Pile Construction
Green Electric Drilling Mud System Double Layers Bored Pile Construction

Xi'an TianRui Petroleum Machinery Equipment Co., Ltd.

Verified Supplier
8 Years
Since 2010
Business Type :
Manufacturer
Total Annual :
40 Million-50 Million
Employee Number :
350~450
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement