ST-30 Geotechnical Soil Testing Water Well Drilling Machine Portable Water Well Drilling Rig
ST 30 Portable Water Well Drilling Rig
Drilling Rig Machine is applicable to small and medium-sized mines and road construction, defense and water conservancy and stone works in the large diameter borehole drilling operations.Portable Drilling Rig is also an indispensable rock drilling facility for open pit mining, especially for bumps and rugged terrain where other drilling vehicles do not work properly,Compact structure, easy operation, quick cutting speed, high efficiency, good demolition, convenient transport;
Technical Parameters
Temperature environment: | - 10 ~ 50 ℃ |
Angle: | 40 degrees |
Drilling pipe: | Ф 42x1500mm (× length diameter) |
Gearbox | |
Rated torque: | 340 n |
Rotation speed: | 0 ~ 180 rpm |
Engine power: | 35 HP / 3600rpm |
Weight excluding drill pipe and bit: | ≤ 145kg |
Dimensions: | 1160 × 900 × 3300 mm |
Drilling method: | air hammer drilling |
Drilling depth: | 15 / 50 feet |
Borehole diameter: | 75mm, 90mm |
Drilling depth: | 30m |
Product Advantages
Light weight & Compact design, convenient to carry and keep.
Patented product, unique design and simple drilling structure;
Easy to transport and can learn how to handle the machine in short time;
Can drill through hard stratum, unless thick rock layer;
Assure easily operation and long life service life, free maintenance
FAQ
1 What's your price term?
The price is the EXW price, if you want we arrange the shipping, please tell me your address.
2.What's your delivery method?
The delivery way is by sea
3.Can you do customized rig?
We do customized quotation according to your exact depth and hole diameters
4.How can you assure your quality?
Quality is our life and we take strict inspection for every order,we sincerely hope the long good business with every valuable customer.
Inspection procedures for core drilling rig
I. Routine appearance inspection
(1) Regularly check whether the paint on the surface layer of the drilling rig is loose, mainly whether the operating parts are rusty;
(2) Regularly check whether the reinforcement is loose;
(3) Regularly check the welding position for faulty welding and desoldering.
II. Idle test run
(1) Carry out no-load actual operation of the drilling rig according to the safety operation procedures, and idle for 20 minutes;
(2) Regularly check whether the operation of the hydraulic transmission system is OK, whether the hydraulic seals, oil pipes and connectors have oil leakage, whether the temperature is OK, and whether the vacuum pressure gauge is OK;
(3) Regularly check whether the reinforcement is loose and whether various practical operations are sensitive and reliable.