Specifications
Brand Name :
JINZHOU SHITAN
Model Number :
BW150
Certification :
ISO
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Payment Terms :
L/C, D/A, D/P, T/T
Supply Ability :
2000 sets per year
Delivery Time :
7-12 days
Packaging Details :
Standard Export Package
Structure :
Gear Pump
Usage :
Water
Application :
Submersible
Power :
Electric
Fuel :
Gasoline
Pressure :
High Pressure
Stroke :
70 mm
Liner Dia. :
70 mm
Gears Position :
8
Max Pump Speed :
222 times per min.
Description

Diesel Slurry Pumps Industrial Mud Pumps BW150 for Water Well Drilling

Drilling Rig Mud Pump Description:

1. Projects: Construction drilling of the projects e.g. prospection, geotechnical investigation(geological exploring), railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction;

2. Exploration: Coal mining exploration, Ore exploration;

3. Water well: Small hole diameter water well drilling;

4. Pipe-installing: Geothermal pipe-installing for heat pump;

5. Foundation piling: Small-diameter hole foundation piling drilling.

Drilling Rig Mud Pump Parameter:

Type Horizontal, triplex, reciprocating, single acting piston pump
Stroke 70 mm
Cylinder dia. 70 mm
Pump speed (r/min) 1500
Output volume (l.p.m) 150; 90; 58; 38; 125; 72; 47; 32
Discharge pressure (Mpa) 1.8; 3.2; 4.8; 7.0; 2.3; 4.0; 6.0; 7.0
Volumetric efficiency 85%
Input power (Kw) 7.5
Suction Pipe dia. (mm) 50
Discharge pipe dia. (mm) 32
Drilling hole depth (m) Diamond core drilling <1500
Dimensions (mm) 1840* 795*995
Weight (kg) 630kg
Type Horizontal, triplex, reciprocating, single acting piston pump
Stroke 70 mm
Cylinder dia. 70 mm
Pump speed (r/min) 1500
Output volume (l.p.m) 150; 90; 58; 38; 125; 72; 47; 32
Discharge pressure (Mpa) 1.8; 3.2; 4.8; 7.0; 2.3; 4.0; 6.0; 7.0
Volumetric efficiency 85%
Input power (Kw) 7.5
Suction Pipe dia. (mm) 50
Discharge pipe dia. (mm) 32
Drilling hole depth (m) Diamond core drilling <1500
Dimensions (mm) 1840* 795*995
Weight (kg) 630kg

Application of Drilling Rig Mud Pump

  • 1. The dam body of earth dam and earth rock dam in the river channel of reservoir, the cracks and loose layer of dam foundation, and the grouting of cement mortar for karst cave and fault water blocking.
  • 2. The grouting of mortar and anchor rod in bolt shotcreting support engineering.
  • 3. Grouting of cement mortar in tunnel engineering.
  • 4. Grouting of cement mortar for diaphragm wall.
  • 5. The mortar pouring at the junction of highway and bridge.
  • 6. High level or long-distance transportation of other high viscosity solid-liquid mixtures.

Precautions for Drilling Rig Mud Pump

  • (1) Always pay attention to the indication of pressure gauge. If the indication of pressure gauge or the safety device does not work after exceeding the pressure, find out the reason and clear the fault
  • Restart.
  • (2) Pay attention to whether the structure of the mortar pump and motor is normal. When any fault is found, stop the pump immediately and open the discharge valve to reduce the pressure and eliminate the fault.
  • (3) Attention should be paid to make the gland press the packing to avoid leakage. If there is still leakage after pressing, the packing or piston should be replaced according to the specific situation.
  • (4) The consistency of the mixed mortar shall be measured before entering the pump. During the test, the consistency meter shall be vertical to the slurry surface, and it shall be laid down easily to sink with its own weight.
  • (5) At the end of each shift, clean water must be pumped immediately, and the pipeline and pump interior must be cleaned until the ball valve, discharge port, suction port and discharge port are ensured
  • The valve is clean and smooth.
  • (6) The upper chamber should be filled with oil.

BW150 Water Well 	Drilling Rig Mud Pump

Send your message to this supplier
Send Now

BW150 Water Well Drilling Rig Mud Pump

Ask Latest Price
Brand Name :
JINZHOU SHITAN
Model Number :
BW150
Certification :
ISO
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Contact Supplier
BW150 Water Well 	Drilling Rig Mud Pump
BW150 Water Well 	Drilling Rig Mud Pump

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
5 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
8000000-15000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement