Specifications
Brand Name :
Shitan
Model Number :
XY-1
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
50 sets per month
Delivery Time :
5-8 work days
Packaging Details :
Plastic film and Standard export wooden box
Product name :
Soil Testing Drilling Rig Machine
Condition :
New
Geological :
Soil, rock, hard rock,
Drilling depth :
100m-120m
Type :
Portable type
Usage :
Soil Testing Drilling
Net weight :
600 KG
Warranty :
1 Year
Description

New Condition 100m-120m Drilling Depth Electric Crawler Rotary Soil Testing Equipment

Crawler Mounted type advantages

1. New Condition Portable Electric Crawler Rotary Soil Testing Drilling Rig Machine adopt four feet. The four feet are hydraulic support legs. Each one is controlled alone which make the platform is fixed on the ground smoothly.
2. The maximum load of the platform is 4500kg and can load ST-200 drilling rig furthest. The size of the platform is reasonable.
3. The chassis adopts rubber track, the material of the advantages is with lighter weight, lower life-cycle costs, and less vehicle running gear noise, less vehicle vibration, less fuel consumption. It does not hurt the pavement in the city roads.

Product Features
1. The new crawler chassis is designed to enhance the bearing capacity of gear, box body and shaft , which make the maximum power of the gearbox can output is nearly double the original product.

2. In the steering and braking structure, single axle steering brake replaces the original the double axle gear brake, which greatly reduces the attrition degree of wear parts.

3. Using wet friction brake is more reliable. The hydraulic transmission tower lifting device is safe and convenient to go up and down and easy to move the whole operation. Also it can be modified according to the customer's reasonable requirements.

Matters Needing Attention in Drilling Process Of Crawler Drilling Rig

1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.

2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.

3. Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.

100m Electric Crawler Rotary Mining Drilling Machine
Send your message to this supplier
Send Now

100m Electric Crawler Rotary Mining Drilling Machine

Ask Latest Price
Brand Name :
Shitan
Model Number :
XY-1
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Payment Terms :
L/C, T/T, Western Union
Contact Supplier
100m Electric Crawler Rotary Mining Drilling Machine
100m Electric Crawler Rotary Mining Drilling Machine

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
5 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
8000000-15000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement