GK180 / GK 200 / XY-1A For Geological Drilling High Speed Drill Gyrator Assembly
Drill Gyrator Assembly Brief Introduction
Function : Rotary drill and drill tool feed.
Structure: Most of the parts of the gyrator are installed in the vertical shaft box. The small bevel gear is mounted on the inner gear shaft through the spline. The ring seat has a ring-shaped "T" bolt and is combined with five "T" bolts. The sleeve is fixed, and the nut on the “T” bolt can be loosened to adjust the tilt angle of the gyrator to achieve angular drilling.
The connection between the gyrator and the gearbox is to fix the turret seat on the gearbox body with 8 bolts. The large bevel gear is connected with the vertical bushing via a key, and the vertical bushing is connected with the vertical car through the hexagonal hole, thereby driving the vertical shaft to rotate the vertical shaft in the vertical shaft. The sleeve can be moved axially, and the movement is realized by pushing the piston rod and the beam into the upper chamber or the lower chamber of the cylinder.
The top shaft is terminated with a top sleeve, and the top sleeve is provided with six steel balls. When the anti-manipulation handle is pressed downward, the six steel balls are pushed toward the center of the vertical shaft through the inner jacket, and the semicircular communication groove of the drill pipe is embedded in the upper shaft. Inside, the drill pipe is clamped on the machine to realize the movement of the drill. When the handle is lifted up, the steel ball is disengaged from the drill pipe and can be inverted.
In order to display the scale of the vertical shaft stroke, a top sleeve with a hexagonal hole is arranged at the upper end of the vertical shaft, and the rotary motion can be transmitted to the drill pipe of the hexagonal machine.
Drilling Rig Components Specifications
100 drilling rig | |
Speed (R / min) | 142 285 570 |
Vertical shaft stroke (mm) | 450 |
No load speed (M / s) | 0.05 |
Vertical shaft no-load downward movement speed (M / s) | 0.067 |
Vertical shaft feed pressure (KN) | 15 |
Vertical axis lifting force (KN) | 25 |
200 drilling rig | |
Speed (R / min) | 115 230 505 1010 |
Vertical shaft stroke (mm) | 450 |
No load speed (M / s) | 0.05 |
Vertical shaft no-load downward movement speed (M / s) | 0.067 |
Vertical shaft feed pressure (KN) | 15 |
Vertical axis lifting force (KN) | 25 |
180 drilling rig | |
Speed (R / min) | 71 182 310 790 |
Vertical shaft stroke (mm) | 450 |
No load speed (M / s) | 0.05 |
Vertical shaft no-load downward movement speed (M / s) | 0.067 |
Vertical shaft feed pressure (KN) | 15 |
Vertical axis lifting force (KN) | 25 |
Low speed 150 drilling rig | |
Speed (R / min) | 71 142 310 620 |
Vertical shaft stroke (mm) | 450 |
No load speed (M / s) | 0.05 |
Vertical shaft no-load downward movement speed (M / s) | 0.067 |
Vertical shaft feed pressure (KN) | 15 |
Vertical axis lifting force (KN) | 25 |
Vertical shaft output torque (kn. M) | 1.25 |
High speed 150 drilling rig | |
Speed (R / min) | 140 295 470 790 1010 |
Vertical shaft stroke (mm) | 450 |
No load speed (M / s) | 0.05 |
Vertical shaft no-load downward movement speed (M / s) | 0.067 |
Vertical shaft feed pressure (KN) | 15 |
Vertical axis lifting force (KN) | 25 |
Drilling Rig Components Purpose
It be used for All of drilling rigs: XY-1, XY-1A, XY-1B, GK-180, GK-200, DPP-100 and other series of drilling rigs