Irrigation 150 Meters Depth Borehole Drilling Machine XY-1A With BW 160 Mud Pump
XY-1A Borehole Drilling Machine Description
Xy-1a drilling rig is a kind of hydraulic feeding, high speed, high speed torque belt and portability with pump.which is suitable for engineering geological exploration of industrial and civil buildings, railways, hydropower, transportation, bridges, dam foundations and other buildings.
XY-1A Borehole Drilling Machine Tech Data
Drill | Swivel Head | ||
Drilling depth
| Max.150m | Spindle speed
| 1010,790,470,295,140(r/min) |
Hole diameter
| Max.150m | Spindle stroke | 450kmm |
Drill rod diameter | 42mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump | ||
Model | YBC-12/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.25Mpa |
Flow speed | 8ml/r | ||
Rated speed | 1500r/min | ||
Hoist | Power(diesel) | ||
Max. lifting capacity | 15KN | Model(diesel engine | ZS1105 |
Hoisting drum revolution | 121,76,36(r/min)
| Rated power | 12.1KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 600KG | ||
SIZE | 1620*970*1560mm |
XY-1A Borehole Drilling Machine Main Advantages
1. It has a hydraulic automatic feeding mechanism to improve drilling efficiency and reduce labor intensity.
2. It adopts the ball card clamping mechanism instead of the chuck, and can implement the non-stop bar, easy to operate, safe and reliable.
3.The hoist is equipped with a frame to form a double-sided support star structure that can withstand strong impact.
4.Four sets of bearing positioning of the vertical axle box ensure that the gyrator has sufficient rigidity to deal with complex geological conditions such as gravel layer and pebble layer.
5.This machine adopts a taper clutch, which has the characteristics of large transmission torque, convenient operation and maintenance-free.
XY-1A Borehole Drilling Machine Application
XY-1A drilling rig is mainly used for geological general investigation and exploration, road and tall buliding foundation exploration, kinds of hole in concrete structure, river levees,earth temperature central air-conditioner,etc.XY-1 Series are spindle core geotechnical drilling rigs most perfectly suitable for borehole drilling in geo-construction and geo-technical exploration drilling in projects like civil building, construction of railway, hydropower, highway, bridge and dam etc.
What aspects should we pay attention to in the drilling process of water well drilling rig?
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.