Specifications
Brand Name :
JINZHOU SHITAN
Model Number :
ST-150
Certification :
ISO
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Payment Terms :
L/C, D/A, D/P, T/T, Western Union
Supply Ability :
2000 sets per year
Delivery Time :
7-10 days
Drilling Depth :
150m
Condition :
New
Hole Diameter :
150mm
Max. Speed :
690
Weight :
600kg
Drill Rod :
42 or 50mm
Description

Exported Water Well Geological Drilling Rig Machine for Siting Investigation

Product Feature:

1.Hydraulic driven, smooth transmission, low noise, compacted control panel, easy to operate, labor-saving, safe and reliable.

2.Crawler chassis mounted, convenient and fast to move and position.

3.Main arm can move up and down, drilling tower slides on sliding frame, stable, safe and reliable.

4.Sliding frame can swing back and forth on the main arm seat, achieving drilling in angles, Besides, a meter is equipped on the sliding frame, showing drilling angles conveniently.

5.Moving of power head is driven by cylinder chain multi speed system with dual chain balance structure.

6.Multifunctional power head has features of sliding clearance compensation and adjustment compensation and stepless speed adjustment large torque slow speed

7.Power head has wide speed range, which can meet the requirement of various formation and different drilling process.

Main Parameter:

Basic Parameters
Drilling depth 150m
Drilling diameter 300mm
Drill pipe diameter 42mm
Gross weight of drilling machine(engine not included) 500kg
Dimension (length ×width × height) 2050 × 1180 × 1420 mm
Revolving Plate
Rotate speed 60 200 400 610 1100 r/min
Maximum torque 1800N*m
Driving travel 450mm
Maximum Cylinder driving force 20,000N
Maximum Cylinder lifting force 30,000N
Lifter
Lifting capacity 24,000N
Bobbin line speed (2 layers) 0.20 0.72 1.26 2.8 m/s
Bobbin diameter 140mm
Rope diameter 11mm
Rope capacity 26m
Drilling rig
Type Steel pipe quadripod
Height 6m
Drive motor
Type Changzhou ZS1100 diesel engine
Rated power 11.03KW
Tare weighr 150kg

There are seven points for attention in the construction process of Geological Drilling Rig

1. The operators of water well drilling rig shall be trained and qualified and take up the post with certificate.

2. The equipment entering the site shall meet the construction requirements, and the trial operation test shall be conducted before the formal start-up of the well drilling rig, and the operation status shall be stated in time.

3. The specific drilling process should be prepared, the operation rules and standards of water well drilling equipment should be prepared, and the construction records should be made.

4. During the drilling process, it is not allowed to rotate until the planned elevation is reached. Maybe if the drill pipe needs to be rotated or raised under special circumstances, the drill pipe should be lifted to the surface, and the bit valve should be dredged and closed from the beginning. The operator should strictly control the descent speed and rotation speed of the threaded bit.

5. Before drilling, carefully check whether the air hole at the top of the core pipe is smooth, whether the concrete delivery hose joint is outstanding, and whether there is distorted appearance.

6. In the process of hole forming, when the drill pipe is found shaking or the footage is slow, the footage should be slowed down to avoid pile hole deflection, displacement and damage of drill pipe and drilling tool.

Water Well Geological Drilling Rig Machine for Siting Investigation

Send your message to this supplier
Send Now

Water Well Geological Drilling Rig Machine for Siting Investigation

Ask Latest Price
Brand Name :
JINZHOU SHITAN
Model Number :
ST-150
Certification :
ISO
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Contact Supplier
Water Well Geological Drilling Rig Machine for Siting Investigation
Water Well Geological Drilling Rig Machine for Siting Investigation

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
5 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
8000000-15000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement