200 Meters Crawler Mounted Durable Fast Speed Deep Water Borehole Drilling Rig Machine
ST 200 Borehole Drilling Rig Description:
The pneumatic dth drilling rig mainly drilling rock must connect with air compressor . it has fast drilling speed ,pneumatic dth drilling rig can drill 20-40m per hour . high drilling effective .the engine it is 63kw ,more powerful .pneumatic water borehole drilling rig it has 4 high hydraulic leg which can lifting 1.6m height can easy loading on the truck .
ST 200 Borehole Drilling Rig Parameters:
Drilling Rig Model | ST-200 |
Weight | 5.8T |
Bore diameter | 140-305mm |
Drilling depth | 200m |
Stroke | 3.4m |
Travelling speed | 2.5km/h |
Gradeability | 30% |
Power | 65-70KW |
Rated pressure | 1.7-3.0mpa |
Air consumption | 17-30m³/min |
Drill rod diameter | Φ76, Φ89 |
Drill rod length | 1.5m 2.0m 3.0m |
Elevating capacity | 15T |
Swing speed | 45-70rpm |
Swing torque | 3500-4800N.M |
Dimensions | 4000*1750*2450mm |
ST 200 Borehole Drilling Rig Advantages:
ST 200 Borehole Drilling Rig Service:
Before sales: Engineering Consultance Service & Technical Support;
After sales: Process clients' feedback and or problems during the operation of the machines within 24 hours;
OEM service: We accept OEM orders and 70 percent of our clients are enjoying OEM services;
What should we pay attention to in hydro power projects?
1. The safety of the water well drilling rig must be checked. All parts must be complete without leakage of cables, drill pipes, drill bits, etc.
2. The drill should be loaded firmly, turn or bend the road, fix the steel wire and fix it;
3. When entering the construction site, the drilling rig should be fixed, the drilling area should be larger than the water well drilling rig, and there should be enough safety space around;
4. When drilling, the drilling position, direction, angle and depth must be strictly followed, and the drill bit must not be modified without authorization;
5. When installing the drill pipe, check the drill pipe to ensure that the drill pipe is not blocked, bent, and the steel wire is not worn. It is strictly forbidden to unqualified the drill pipe;
6. When loading and unloading the drill bit, strictly prevent the pipe clamp from clamping the cemented carbide parts, and it is strictly prohibited to prevent the flat drill bit and core pipe.