Specifications
Brand Name :
ShiTan
Model Number :
GK200
Certification :
ISO9001
Place of Origin :
China
MOQ :
Negotiation
Price :
Negotiation
Payment Terms :
T/T, Western Union
Delivery Time :
Within 7ays
Packaging Details :
Wooden box
Product Name :
Easy Movement 295mm Hole Diameter Engineering GK 200 Hydraulic Borewell Machine
Type :
hydraulic drilling rig
Color :
Red Yellow Blue
Feature :
High Drilling Efficiency
Usage :
Water Well
Application :
Soil Sampling,water well drilling
Power Type :
Diesel
Drilling Depth :
200 Meters
Hole Diameter :
75-275mm
Warranty :
12 months
OEM :
acceptable
Mud Pump :
BW 160
Condition :
New
Description

295mm Hole Diameter Engineering GK 200 Hydraulic Borewell Machine

GK 200 Hydraulic Borewell Machine Information

Gk200 drilling rig is designed by adding mud pump based on xy-1a drilling rig according to customer feedback. It is a high-speed portable drilling rig fed by hydraulic pressure,adopting large Kelly,double guide pipe. Increase the stability,the drilling depth is 200 meters,the hole diameter is from 75-300mm.

GK 200 Hydraulic Borewell Machine Tech Data

Drilling depth
200m
Maximum opening diameter
75-300mm
Final hole diameter
75mm
Sizes
53/59*4200mm
Drill pipe diameter
50,60mm
Drilling angle
90°~75°
Auxiliary power diesel engine
15/2200kW/r/min
Structural weight/Size
1150kg/2700*950*1770

GK 200 Hydraulic Borewell Machine Features

With the hydraulic feeding mechanism,improve the drilling efficiency,reducing the labor intensity of workers.

The rig is equipped with a ball on a cassette holding mechanism and a six side rod, the rod can be replaced without shutdown, high work efficiency, safe and reliable

Furnished with hole bottom pressure gauge pressure indicator,and easy to master the status inside the hole

The handle centered, convenient operation.

The drilling machine has the advantages of compact structure,small volume,light weight,convenient move,decomposition and strong,suitable for the plains or mountain areas.

GK 200 Hydraulic Borewell Machine Application

1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.
2 geological core drilling and physical survey.
3 drilling of small grouting holes and blasting holes.
4 drilling of small water wells.

During drilling, the power of the drilling rig drives the rotary table, Kelly, drill pipe and drill bit to rotate.

Observe the working condition of the down hole drill bit through the instruments on the ground of the drilling rig. After comprehensive judgment, if the drill bit is considered to have been worn, stop drilling immediately and replace the drill bit. After the drilling is stopped, the drilling fluid circulation shall be maintained for a period of time. The purpose is to adjust the performance of the drilling fluid, bring the rock cuttings suspended in the drilling fluid out of the ground, circulate to keep the new borewell wall stable, and conduct routine inspection of the drilling equipment. The driller uses the crown block, traveling block and hook on the derrick to pull out all drilling tools from the well according to the height of the derrick and the column (usually composed of two or three drill pipes). After pulling out, the drill pipe column is discharged into the derrick in sequence. While lifting the down hole drill string, the drilling fluid shall be continuously injected into the annular space with the drilling pump to keep the liquid level in the borewell from falling, so that the pressure in the borewell can balance the formation pressure, so as to prevent the borewell from collapsing or the fluid in the down hole formation from entering the borewell. At the same time, pay special attention to the possible sticking of the drill pipe due to the wall shrinkage, and the operator shall strictly control the lifting speed. After all the drill pipes and drill collars in the borewell are pulled out, the drill bits to be replaced will be pulled out at the same time. The workers can resume drilling after unloading the old drill bits, installing new drill bits and lowering them into the well according to the original column sequence.

Easy Movement Deep Borewell Machine 295mm Hole Diameter Engineering Gk 200

Easy Movement Deep Borewell Machine 295mm Hole Diameter Engineering Gk 200

Easy Movement Deep Borewell Machine 295mm Hole Diameter Engineering Gk 200

Send your message to this supplier
Send Now

Easy Movement Deep Borewell Machine 295mm Hole Diameter Engineering Gk 200

Ask Latest Price
Watch Video
Brand Name :
ShiTan
Model Number :
GK200
Certification :
ISO9001
Place of Origin :
China
MOQ :
Negotiation
Price :
Negotiation
Contact Supplier
video
Easy Movement Deep Borewell Machine 295mm Hole Diameter Engineering Gk 200
Easy Movement Deep Borewell Machine 295mm Hole Diameter Engineering Gk 200

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
5 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
8000000-15000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement