Specifications
Brand Name :
JINZHOU SHITAN
Model Number :
Gy 200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Payment Terms :
T/T, Western Union
Supply Ability :
20000 sets per year
Delivery Time :
7-12 days
Packaging Details :
Standard Export Package
Product Name :
Gy 200 Borehole Drilling Machine Equipment
Condition :
New
Type :
Borehole Drilling Machine
Power Type :
Diesel
Usage :
Water Well,geological exploration
Voltage :
380V
Power(W) :
16.2kw
Dimension(L*W*H) :
1730*860*1360mm
Weight :
585kg
Drilling Depth :
300m
Drilling Diameter :
75-200mm
Engine :
Diesel Power
Description

High Speed Multi Geo Engineering Borehole Drilling Machine Equipment

GY 200 Borehole Drilling Machine Information:

GY-200 Drilling Rig is a light multifunctional engineering project prospecting drilling rig.The drilling depth is 300 meters and hole diameter can be customized,it is with 360 angle and lifting force can be 3900n.

GY 200 Borehole Drilling Machine Technical Data:

Drilling depth 60 225 295m
Drilling diameter 300 76 46mm
Drill pipe diameter 50 42mm
Spindle Turnable Angle 0-360degree
Net weight(excluding the power machine) 670kg
Dimension(length*width*height) 1820*980*1400mm
Revolving Plate
Spindle speed 900 475 388 205 157 68 r/min
Maximum torque 2000N*m
Driving travel 400mm
Maximum Cylinder driving force 2,9000N
Maximum Cylinder lifting force 3,9000N
Lifter
Lifting capacity 3,0000N
Bobbin line speed (2 layers) 0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter 135mm

GY 200 Borehole Drilling Machine Advantage

Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

With light single derrick cell, the derrick can be dismantled and handled easily and safely.

Optimized structure, small volume, and lightweight.

GY 200 Borehole Drilling Machine Application

1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.

1.1.2 geological core drilling and physical survey.

1.1.3 drilling of small grouting holes and blasting holes.

How do you take soil samples for construction?

In this method by excavation a hole is created and the soil dry density to be measured with it. The hole is filled with uniform sand of known dry density. Dividing the mass of sand poured into the hole with dry density of sand gives the volume of hole.

High Speed Borehole Drilling Machine Multi Geo Engineering Gy200

High Speed Borehole Drilling Machine Multi Geo Engineering Gy200

High Speed Borehole Drilling Machine Multi Geo Engineering Gy200High Speed Borehole Drilling Machine Multi Geo Engineering Gy200High Speed Borehole Drilling Machine Multi Geo Engineering Gy200

Send your message to this supplier
Send Now

High Speed Borehole Drilling Machine Multi Geo Engineering Gy200

Ask Latest Price
Watch Video
Brand Name :
JINZHOU SHITAN
Model Number :
Gy 200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Contact Supplier
video
High Speed Borehole Drilling Machine Multi Geo Engineering Gy200
High Speed Borehole Drilling Machine Multi Geo Engineering Gy200

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
5 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
8000000-15000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement