Farming DHT Blasting Deep Water 400 Meters Borehole Drilling Machine
ST 400 Borehole Drilling Machine Information
ST 400 is with 400 meters depth ,suitable for geothermal air conditioning holes and other wells, especially suitable for water intake projects in mountainous areas and rock formations,this rig can both work with mud pump and air compressor .
ST 400 Borehole Drilling Machine Main Technical Data
Product Name | ST 400 |
Max drilling depth | 400 Meters |
Drilling diameter | 105-325 mm |
Air pressure | 1.2-3.5mpa |
Rod length | 3 meter |
Rod diameter | 89-102-114mm |
Main shaft pressure | 5T |
Lifting force | 25T |
Power head stroke | 6.6M |
Max rotary torque | 12000Nm |
Max rotary speed | 100r/ rmin |
Secondary winch liftng force | 3T |
Jacks stroke | 1.5m |
Moving speed | 2.5km/h |
Uphill angle | 21°Slope |
Weight of the rig | 8.8T |
The engine | 92KW / 6 cylinder |
Overall dimensions | 3900*1600*2350mm |
Working condition | Loose layer and bedrock |
Drilling method | Hydraulic rotary, down-the-hole impactor |
1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.
What is the construction technology of de watering well?
Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.
Why is the water well drilling rig not suitable for use in rainy days?
After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.