Specifications
Brand Name :
JINZHOU SHITAN
Model Number :
Gy 200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Payment Terms :
T/T, Western Union
Supply Ability :
20000 sets per year
Delivery Time :
7-12 days
Packaging Details :
Standard Export Package
Product Name :
Multifunctional Engineering Project Prospecting 400 Meters Depth Borehole Drilling Machine
Type :
Core Drilling Rig,water well drilling rig
Power Type :
Diesel
Usage :
Water Well,geological exploration
Voltage :
380V
Power(W) :
16.2kw
Dimension(L*W*H) :
1730*860*1360mm
Weight :
585kg
Drilling Depth :
300m
Drilling Diameter :
75-200mm
Engine :
Diesel Power
Description

Multifunctional 400 Meters Depth Borehole Drilling Machine Engineering Project Prospecting

Multifunctional Engineering Project Prospecting 400 Meters Depth Borehole Drilling Machine

GY 200 Borehole Drilling Machine Introduction:

It is a light multifunctional engineering project prospecting drilling rig,with 300 meters depth and 300mm hole diameter, It was designed for geologic structure prospecting of industrial and civil constructions.

GY 200 Borehole Drilling Machine Technical Information:

Drilling depth 60 225 295m
Drilling hole diameter 300 76 46mm
Pipe rod diameter 50 42mm
Spindle Turnable Angle 0-360degree
Net weight(excluding the power machine) 670kg
Dimension(length*width*height) 1820*980*1400mm
Revolving Plate
Spindle speed 900 475 388 205 157 68 r/min
Maximum torque 2000N*m
Driving travel 400mm
Maximum Cylinder driving force 2,9000N
Maximum Cylinder lifting force 3,9000N
Lifter
Lifting capacity 3,0000N
Bobbin line speed (2 layers) 0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter 135mm

GY 200 Borehole Drilling Machine Features

1.Wide range if P.R.M and well-set gears

2.Great torque in low P.R.M, fit for coring drilling and piling hole works.

3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

5.With light single derrick cell, the derrick can be dismantled and handled easily and safely.

GY 200 Borehole Drilling Machine Application

1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.

1.1.2 geological core drilling and physical survey.

1.1.3 drilling of small grouting holes and blasting holes.

1.1.4 small water well drilling

Correct Use of Small Geophysical Drilling Rig

In order to ensure the normal construction of the drilling rig and avoid failures as much as possible, it is important to know the correct use of the drilling rig in addition to selecting a drilling rig with good quality and performance

1, First of all, there must be an essential first step, that is, the installation and preparation of the drilling rig. 1. Prepare the rock drilling cavern. The cavern specifications can be determined according to the drilling method. Generally, when drilling horizontal holes, the cavern height is 2.6-2.8 meters, when drilling upward holes, and when drilling downward holes or inclined holes, the cavern width is 2.5 meters, and the height is 2.8-3 meters. 2. Lead the air and water pipelines, lighting lines, etc. to the working face for future use. 3. The column shall be erected firmly according to the design requirements of the hole. The upper and lower ends of the pillar shall be padded with wood plates, and the horizontal shaft and snap ring shall be installed on the pillar according to a certain height and direction. The machine shall be lifted by the hand winch, fixed on the pillar according to the required angle, and then the hole direction of the drill shall be adjusted.

2, Secondly, the second key step is the inspection before operation. 1. When starting work, carefully check whether the air and water pipelines are firmly connected and whether there is air and water leakage. 2. Check whether the oil injector is filled with oil. 3. Check whether the screws, nuts, joints, etc. of each part have been tightened, and whether the column is firmly jacked.

3, Then, it is the drilling operation procedureWhen opening, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get a proper propulsion force, and then pull the handle controlling the impactor to the working position. After rock drilling, the water valve can be opened to keep the air water mixture at a proper proportion. Stop the operation of the motor, stop the air and water supply to the impactor, insert the fork into the drill pipe slot of the tool holder, make the motor reverse the sliding plate back, disconnect the joint from the drill pipe, connect the second drill pipe, and press down to work continuously

Multifunctional 400 Meters Depth Borehole Drilling Machine Engineering ProjectMultifunctional 400 Meters Depth Borehole Drilling Machine Engineering ProjectMultifunctional 400 Meters Depth Borehole Drilling Machine Engineering ProjectMultifunctional 400 Meters Depth Borehole Drilling Machine Engineering ProjectMultifunctional 400 Meters Depth Borehole Drilling Machine Engineering ProjectMultifunctional 400 Meters Depth Borehole Drilling Machine Engineering Project

Send your message to this supplier
Send Now

Multifunctional 400 Meters Depth Borehole Drilling Machine Engineering Project

Ask Latest Price
Watch Video
Brand Name :
JINZHOU SHITAN
Model Number :
Gy 200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 set
Price :
Negotiation
Contact Supplier
video
Multifunctional 400 Meters Depth Borehole Drilling Machine Engineering Project
Multifunctional 400 Meters Depth Borehole Drilling Machine Engineering Project

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Supplier
5 Years
hebei, jinzhou
Since 2010
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
8000000-15000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement