GY 200 Borehole Drilling Machine Introduction:
It is a light multifunctional engineering project prospecting drilling rig,with 300 meters depth and 300mm hole diameter, It was designed for geologic structure prospecting of industrial and civil constructions.
GY 200 Borehole Drilling Machine Technical Information:
Drilling depth | 60 225 295m |
Drilling hole diameter | 300 76 46mm |
Pipe rod diameter | 50 42mm |
Spindle Turnable Angle | 0-360degree |
Net weight(excluding the power machine) | 670kg |
Dimension(length*width*height) | 1820*980*1400mm |
Revolving Plate | |
Spindle speed | 900 475 388 205 157 68 r/min |
Maximum torque | 2000N*m |
Driving travel | 400mm |
Maximum Cylinder driving force | 2,9000N |
Maximum Cylinder lifting force | 3,9000N |
Lifter | |
Lifting capacity | 3,0000N |
Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
Bobbin diameter | 135mm |
GY 200 Borehole Drilling Machine Features
1.Wide range if P.R.M and well-set gears
2.Great torque in low P.R.M, fit for coring drilling and piling hole works.
3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.
4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.
5.With light single derrick cell, the derrick can be dismantled and handled easily and safely.
GY 200 Borehole Drilling Machine Application
1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.
1.1.2 geological core drilling and physical survey.
1.1.3 drilling of small grouting holes and blasting holes.
1.1.4 small water well drilling
Correct Use of Small Geophysical Drilling Rig
In order to ensure the normal construction of the drilling rig and avoid failures as much as possible, it is important to know the correct use of the drilling rig in addition to selecting a drilling rig with good quality and performance
1, First of all, there must be an essential first step, that is, the installation and preparation of the drilling rig. 1. Prepare the rock drilling cavern. The cavern specifications can be determined according to the drilling method. Generally, when drilling horizontal holes, the cavern height is 2.6-2.8 meters, when drilling upward holes, and when drilling downward holes or inclined holes, the cavern width is 2.5 meters, and the height is 2.8-3 meters. 2. Lead the air and water pipelines, lighting lines, etc. to the working face for future use. 3. The column shall be erected firmly according to the design requirements of the hole. The upper and lower ends of the pillar shall be padded with wood plates, and the horizontal shaft and snap ring shall be installed on the pillar according to a certain height and direction. The machine shall be lifted by the hand winch, fixed on the pillar according to the required angle, and then the hole direction of the drill shall be adjusted.
2, Secondly, the second key step is the inspection before operation. 1. When starting work, carefully check whether the air and water pipelines are firmly connected and whether there is air and water leakage. 2. Check whether the oil injector is filled with oil. 3. Check whether the screws, nuts, joints, etc. of each part have been tightened, and whether the column is firmly jacked.
3, Then, it is the drilling operation procedure