Coal Mining 50 Meters Investigation Exploration Trailer Mounted Drilling Rigs
ST 50 Trailer Mounted Drilling Rigs Description
ST 50 is a lightweight ,easy movement ,potable drilling rig.According to the different layers of the bottom selection of alloys, diamonds and composite drill bits for drilling.mine drilling rig 50m drilling.is mainly used for geological general investigation and exploration, road and tall building foundation exploration, kinds of hole in concrete structure, river levees, civil wells and earth temperature central air-conditioner
ST 50 Trailer Mounted Drilling Rigs Parameter
Max.drilling depth | 50m |
Max .opening diameter | φ75-φ108mm |
End hole diameter | 56-75mm |
Active drill pipe | 50/1000mm |
Drill pipe diameter | Φ42mm |
Drill pipe length | 1000mm |
Power (diesel engine) | 5.8kw(8P)/2200r/min |
Size | 1400*600*1600mm |
Weight | 240kg |
Spindle | |
Speed | 285-570r/min |
Torque | 600 N*m |
Stroke | 1000mm |
Lifting force | 300KG |
Pressure | 200KG |
Drilling Tower (optional) | |
Rated load | 1t |
Height | 4m |
Tower leg specifications | 60mm |
Mud Pump | |
Model | BW-50 |
Flow | 50L/min |
Max.pressure | 1.2Mpa |
Times | 63/min |
Inlet hose diameter | φ55mm*2.5m |
Outlet hose diameter | Φ20mm*10m |
ST 50 Trailer Mounted Drilling Rig Feature
Rural Water Wells Aspects
1,Select appropriate well type
The well types of water source wells are divided into deep wells, large wells, counterpart pumping wells, foreign wells, and small-diameter tube wells. In areas with abundant deep groundwater, it is appropriate to drill deep wells. In areas with abundant shallow groundwater, it is appropriate to drill large wells, counterpart pumping or small-diameter tube wells.
2,Reasonable well layout
The location and layout of wells shall be reasonably arranged according to the local actual hydro geological conditions. If there is no hydro geological data, refer to the existing water source wells around as the basis for the layout of wells. In areas where shallow groundwater is not abundant, shallow wells should not be drilled blindly; In areas with abundant shallow groundwater, it is suitable for farmers to build their own shallow wells, but the well hole layout should not be too dense to avoid the interaction between adjacent water source wells.
3,Configure appropriate water pump
After the well is completed, measure the water level of the water outlet well and the corresponding water output according to the drainage condition of the drilling machine, and then determine the total head of the water pump according to the height difference from the ground to the dynamic water level and the irrigation method you adopt, and the required working head of the water pump. The flow of the water pump shall not exceed the water flow through the well. The corresponding water pump shall be purchased on the premise of the above two items.