Mini SPT Sample Collecting Borewell Vertical Soil Testing Drilling Rig
ST 50 Soil Testing Drilling Rig Information:
ST 50 is suitable for drilling wells, general exploration, geophysical prospecting, road and construction exploration, and blasting holes.According to the different layers of the bottom selection of alloys, diamonds and composite drill bits for drilling.mine drilling rig 50m drilling
ST 50 Soil Testing Drilling Rig Parameter:
Max. drilling depth | 50m |
Max .opening diameter | φ75-φ108mm |
End hole diameter | 56-75mm |
Active drill pipe | 50/1000mm |
Drill pipe diameter | Φ42mm |
Drill pipe length | 1000mm |
Power (diesel engine) | 5.8kw(8P)/2200r/min |
Size | 1400*600*1600mm |
Weight | 240kg |
Spindle | |
Speed | 285-570r/min |
Torque | 600 N*m |
Stroke | 1000mm |
Lifting force | 300KG |
Pressure | 200KG |
Drilling Tower (optional) | |
Rated load | 1t |
Height | 4m |
Tower leg specifications | 60mm |
Mud Pump | |
Model | BW-50 |
Flow | 50L/min |
Max.pressure | 1.2Mpa |
Times | 63/min |
Inlet hose diameter | φ55mm*2.5m |
Outlet hose diameter | Φ20mm*10m |
Features of model 50 hydraulic portable drilling rig
Replacement of oil filter element:
1. Unscrew and discard the oil filter.
2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.
3. Check whether the differential pressure transmitter is normal.
4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.
5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.
6. After startup, check whether there is leakage.
Note: the filter element can be replaced only after the screw machine is stopped and the pressure is released. Be careful of hot oil to prevent scalding.