10000LPD UHT Milk Processing Line for Long Shelf Life Milk / Pure Milk ISO9001
General Information:
Brand Name: | Shanghai Beyond |
Model Number: | BY-UM |
Capacity | 5-200TPD |
Raw material | Fresh cow milk, buffalo milk, goat milk, camel milk or milk powder, or both mixed |
End product | Pure milk, UHT milk, long shelf life milk |
Shelf life | 35-40days, 3months, 6months, 12months (keep at room temperature ) |
Final product fat (%) | Semi-skimmed or double toned milk (1.5%); Full cream(3% or 6%); Toned milk(3%) |
SNF | 8.5%(min) |
Main material for machines | SUS304 or SUS316 |
Package for end product | plastic bag |
Certification: | ISO9001/CE/SGS |
Place of Origin: | China |
Manufacturer history | More than 10years |
Description:
Shanghai beyond machinery co., ltd is specialized in supplying various kinds of milk processing line, including the pasteurized milk, UHT milk, flavored milk, yoghurt, cheese and butter, cream, condensed milk etc.
Shanghai Beyond can supply complete turnkey projects for customers, integrating with designing, equipment manufacturing, to installation and commissioning and also training the operators.
UHT milk process: milk transporting tank or vessels, milk filter and collection tank; cooling and storaging tank(milk chilly tank), Mixing/Blending and milk standardization, cream separation, UHT sterilizer(tubular type or plate type) homogenization, degassing, and filling
Technical parameters:
|
*Duration of Guarantee:
1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.
2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.
3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.
*installation terms:
1. 50-60 days for installation and commissioning.
2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.
3. buyer provide round way air tickets,local traffic , room and board,in addition pay subsidary per day for each engineer.