Aseptic Pouch Package UHT Milk Processing Line 200-500ml
Features and advantages:
1. Processing capacity can be ranged from 2T/Day to 1000T/Day.
2. High standard design, manufacture and project installation requirements, which guarantee the first-class finish products in the dairy processing line.
3. PLC control the whole production line, saving labor force and facilitate production management.
4. Full-auto CIP cleaning, to ensure whole production line equipments meet food sanitary safety requirements.
5. Whole line with features as high level automatic, low labour intensity, easy operation, safe function and low operation cost.
Information:
Product Name | 5-200TPD Long shelf life UHT milk line |
Processing line type | Complete turn-key project |
Power consumption(Kw) | energy saving type, about 100-500kw, |
Operator needed | About 4-18persons |
Cooling water consumption | About 60-500M3 |
Steam consumption | About 200-4000T/H, |
Factory space needed | About 400-6000Sqm |
Warranty | 12 months |
Company introduction:
Shanghai Beyond Machinery Co., Ltd, established in the year of 2005, is a manufacture specialized technology-oriented machinery. BEYOND is able to provide the turn-key projects, including the design, manufacture, installation and commissioning for the production lines of liquid food such as dairy, drink, ice cream, fruit and vegetable, bio-engineering, chemical and pharmaceutical.
Cooperated with several domestic and abroad Light Industrial or scientific research institutions, we absorb their advanced technology and then take base to develop new even better process techniques, we are now specializing in all kind of sanitary stainless steel tanks, heater, cooler, sterilizer, concentrator, pump and other pipe and fittings.
Through the years of the common efforts of our staff, we have obtained high share in the market of machinery industry, and have developed ourselves into a medium-sized enterprise of certain popularity in the industry. Combining scientific research, technical development, production, marketing and after-sale service, we keep ourselves acting strictly in accordance with the quality assurance system of ISO 9001, to ensure us to provide the good quality equipments that are in accordance with the relative standards of Juice, Dairy, Pharmacy, bio-chemical, such as HACCP, QS and GMP etc.
Thank you very much for the trust of all our customers and we expect to build up good business cooperation friendship with more and more clients, and warmly welcome to your visiting to our factory!
Specifications:
Brand Name: | Shanghai Beyond |
Model Number: | BY-UM |
Capacity | 5-200TPD |
Raw material | Fresh cow milk, buffalo milk, goat milk, camel milk or milk powder, or both mixed |
End product | Pure milk, UHT milk, long shelf life milk |
Shelf life | 35-40days, 3months, 6months, 12months (keep at room temperature ) |
Final product fat (%) | Semi-skimmed or double toned milk (1.5%); Full cream(3% or 6%); Toned milk(3%) |
SNF | 8.5%(min) |
Fresh milk inlet temperature | 4 ℃ |
Filling temperature | 20~30 ℃ |
Package for end product | plastic bottle |
Certification: | ISO9001/CE/SGS |
Main material for machines | SUS304 or SUS316 |
Place of Origin: | China |
Manufacturer history | More than 10years |
Voltage | 380V 50Hz/110V 60hz/415V 50Hz |
Power consumption(Kw) | energy saving type, about 100-500kw, |
Operator needed | About 6-20persons |
Cooling water consumption | About 80-300M3 |
Steam consumption | About 300-5000T/H, |
Factory space needed | About 500-5000Sqm |
Warranty | 12 months after commissioning |
*Duration of Guarantee:
1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.
2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.
3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.
*installation terms:
1. 50-60 days for installation and commissioning.
2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.
3. buyer provide round way air tickets,local traffic , room and board,in addition pay subsidary per day for each engineer.