Hydraulic Ductile Iron Ball Valve Float In The Water Flange Ends Connection
Product overview
The valve consists of the main valve and outside installed pilot valve. It uses the float in the water to link the pilot valve upon the change of the water surface to make the main valve supply water or be closed, and thus to control the water level of the water pool(box) and the water tower within certain limits, to prevent overflow and excessive low water level. This valve is used in automatic water supply systems of various pools(box), water tower in industrial and mining enterprises, civil construction and also used in atmospheric boiler circulation water supply system. The main valve opens fast and closed slowly, do not produce water hammer, sealed tight, no flood threat.
Product Name | Material | ||
Valve Body | Ductile iron, plastic spraying | ||
Wedge Disc | Ductile iron, overall EPDM coating | ||
Stem | stainless steel | ||
Spring | stainless steel |
Main Features
1) Reasonable and novel structure, reasonable use of the hydraulic principle cybernetics.
2) Stable and reliable operation, large flow.
3) Valve clack quick opening and slow closure, no water hammer impacting(closing time adjustable).
4) Good check sealing effect, long service life.
5) Easy installation and maintenance.
Our Main Products
Gate Valve, Water power Control Valve, Center Line Butterfly Valve, Flanged Butterfly Valve, Metal Butterfly Valve, Check Valve, Micro resistance Slow Close Check Valve, Multi-function Pump Control Valve.
Main exporting market: Europe, America South American, Spain, Italy, Russia, Middle East.
Packaging Details
(1). We will pack your items by carton or plywood cases for exporting standard.
(2). We can also pack your items according to your requirements.
Our Service
1. Good quality and low price.
2. Good after-sale service.
3. Bring the finest goods to customer is our ultimate goal.
4. Products are exported to various countries.
Q: Is sample order acceptable?
A: Yes,of course.
Q: How to place the order?
A: You can send us email or inquiry.
Q: How many days for delivery?
A: Normally within 15~30 days after receipt of payment.
Q: How to make the payment?
A: We accept T/T, L/C.
Q: How will you make the shipment?
A: By sea, air or express service.