T8 LED Tube Technical Parameters:
Length | Input Voltage | Power Consumption | LED Q'ty | PF | Luminous Flux | CCT | Ambient Tem | Work Life | Material | Certification | Replaced CFL Power | LED Type | N.W | G.W | PCS/CTN | Carton Size |
T8 0.6M | AC90-260V | 9W | 70PCS | >0.93 | 100-110LM/W | 6000-6500K/4000-4200K/3000-3200K | -20~45°C | >50000H | 6063 Alu+PC | CE&ROHS | 20W | SMD | 10KGS | 16KGS | 50 | 125.5*18.5*18.5 |
T8 0.9M | AC90-260V | 15W | 110PCS | >0.93 | 100-110LM/W | 6000-6500K/4000-4200K/3000-3200K | -20~45°C | >50000H | 6063 Alu+PC | CE&ROHS | 30W | SMD | 6.25KGS | 10KGS | 25 | 95.5*18.5*18.5 |
T8 1.2M | AC90-260V | 18-20W | 140PCS | >0.93 | 100-110LM/W | 6000-6500K/4000-4200K/3000-3200K | -20~45°C | >50000H | 6063 Alu+PC | CE&ROHS | 40W | SMD | 8KGS | 16KGS | 25 | 125.5*18.5*18.5 |
Application:
1.Replacement CFL for general lighting in hotel,Building (architecture or home) decoration
2.Public
3. Home lighting such as home / hotel / meeting room / office / factory / supermarket / kitchen, etc.
Trading Process:
Various shipment ways for choice:
Trade Term:
Quality Control:
The lamps are tested under QC’s procedure, to make sure of
offering good quality as requested.
Delivery Detail for Lighting:
Deliever goods by UPS/DHL/FEDEX/TNT express which takes 3~ 5 days to arrive, or by air cargo which takes about one week to arrive , or by sea which takes about one month to arrive , depending on your actual requirements.
Our Services:
1. For all your inquires, we will reply you in details within 24 hours.
2. Newsoar owns well-trained and professional sales & after- sales services.
3. Newsoar offers OEM R&D services for commercial lighting such as led downlights, LED spotlight, LED panel light, LED lamp cup, LED bulbs,etc.
Contact Info:
Ms Yuki
Mob: +86-13435454587
Tel: +86-760-23794548
Skype: yssxlq
Wechat: +86-13435454587