Three Section Furnace Body Foaming Machine For XPE XLPE Foam Production
XLPE XPE Horizontal furnace: The foaming furnace adopts a new three-stage extended furnace. The furnace body is divided into three parts: preheating section, cross-linking section, and foaming section. The total length of the furnace body is 24.4 meters, the height is 4.75 meters, and the width is 3 meters. Equipped with a famous brand high-precision energy-saving burner to ensure precise temperature control, it can produce XPE, IXPE, and rubber and plastic foam products.
Features: Low energy consumption: The preheating section and cross-linking section have been greatly changed. Under the condition of meeting the process requirements, the heat capacity space is reduced, energy saving and consumption reduction are achieved, and the gas consumption is equivalent to that of the two-stage furnace.
Specification:
XPE Horizontal Foaming Furnace |
Unit |
XPE 24400-2000 |
Equipment Dimensions |
mm |
24400*3000*4750 |
Equipment Output |
kg/h |
60-200 |
Burner Heat Output |
Kcal |
300,000 |
Temperature Zone |
Zone |
3 |
Production Max Width |
mm |
2000 |
Production Thickness Range |
mm |
3-12 |
Preheating fan power |
KW |
18.5 |
Crosslinking fan power |
KW |
15 |
Foaming fan power |
KW |
37 |
XPE horizontal cross-linking foaming furnace includes the following units:
Master Unwinding Machine Furnance Mouth Tractor Horizontal Furnance Unit
Cooling and Shaping Unit Double Station Winder
FAQ:
Q1:What plastic foaming machines could your company provide?
Internal mixer machine, Granulation machine, XPE foam extrusion machine,
XLPE Horizontal foaming furnace, IXPE Vertical foaming furnace, Embossing machine,
Foam laminating machine, Foam thicking machine, Glue coating machine, PE slicing machine.
Q2:What kind of services can you provide?
We are specialized in manufacture the XPE/IXPE Foaming equipment, in addition to installation and setup the production line, our service also includes provide raw material formula, process parameters and other technical services to the buyer freely.
Q3:How long is your lead time?
Normally it's about 10-25 weeks after order confirmed and deposit received.