XLPE Horizontal Foaming Furnace XPE Foaming Machine For PE Foam Making
XLPE XPE Horizontal furnace: The foaming furnace adopts a new three-stage extended furnace. The furnace body is divided into three parts: preheating section, cross-linking section, and foaming section. The total length of the furnace body is 24.4 meters, the height is 4.75 meters, and the width is 3 meters. Equipped with a famous brand high-precision energy-saving burner to ensure precise temperature control, it can produce XPE, IXPE, and rubber and plastic foam products.
XPE horizontal cross-linking foaming furnace includes the following units:
Unwinder unit, Feeding unit, Horizontal foaming furnace unit, Five-roller cooling unit, Double station winder unit.
Specification:
XPE Horizontal Foaming Furnace |
Unit |
XPE 24400-2000 |
Equipment Dimensions |
mm |
24400*3000*4750 |
Equipment Output |
kg/h |
60-200 |
Burner Heat Output |
Kcal |
300,000 |
Temperature Zone |
Zone |
3 |
Production Max Width |
mm |
2000 |
Production Thickness Range |
mm |
3-12 |
Preheating fan power |
KW |
18.5 |
Crosslinking fan power |
KW |
15 |
Foaming fan power |
KW |
37 |
XPE horizontal cross-linking foaming furnace includes the following units:
Master Unwinding Machine Furnance Mouth Tractor Horizontal Furnance Unit
Cooling and Shaping Unit Double Station Winder
Machine Type |
QTY |
Master Unwinding Machine |
1 Set |
Furnace Mouth Tractor | 1 Set |
Cooling and Shaping Unit | 1 Set, 5 Roller Cooler |
Surface Treatment Machine | 1 Set, Surface Calender |
Corona Machine | Optional |
Correction Machine | 2 Set, Guid Correction |
Traction Trimming Machine | 1 PC |
Double Station Winder | 1 PC |
FAQ:
Q1:What plastic foaming machines could your company provide?
Internal mixer machine, Granulation machine, XPE foam extrusion machine,
XLPE Horizontal foaming furnace, IXPE Vertical foaming furnace, Embossing machine,
Foam laminating machine, Foam thicking machine, Glue coating machine, PE slicing machine.
Q2:What kind of services can you provide?
We are specialized in manufacture the XPE/IXPE Foaming equipment, in addition to installation and setup the production line, our service also includes provide raw material formula, process parameters and other technical services to the buyer freely.
Q3:How long is your lead time?
Normally it's about 10-25 weeks after order confirmed and deposit received.
Q4:How long is the guarantee period of the machines? When does it start?
The guarantee period of our equipment is one year, calculated the date from when it leaves the factory. During the guarantee period, we provide normal damaged spare parts for free. After the guarantee period, we only take the cost of components.
Q5:Is there any vulnerable parts? How to do if the vulnerable parts damaged?
Yes, for the new XPE / IXPE enterprises, we provide operator training services to help enterprises enter into the normal production state in the shortest time.