8*5 Spliced Foam Water Mat Easy To Roll Floating Play Mat For Pool
Our company is specialized in foam floating mat with different designs:
Feature of floating mat:
Closed -cell XPE Foam
Tear Resistant
Puncture Resistant
Multi-Layers
Various Application
Easy to Roll
Easy to Clean
UV-stable Foam Coloring
Rust-resistant Hardware
Smooth Touch Finish
Carton Storage Box
High density of 33kg/m³
Specification of spliced foam floating mat:
2 spliced foam panels +1 Zipper | ||||
Open Size | 1830*1830*40mm | 2450*1530*40mm | 2450*1530*32mm | 1830*1830*32mm |
Foldable Size | 191*92*9cm | 155*123*9cm | 155*123*7cm | 191*92*7cm |
Accessories | Rope(4.2m) + Caribiner on end, ABS Grommet | |||
Load Bearing Weight | 800Lbs |
3 spliced foam panels +2 Zippers | ||||
Open Size | 2750*1830*40mm | 3650*1530*40mm | 3650*1530*32mm | 2750*1830*32mm |
Foldable Size | 191*96*13cm | 155*123*13cm | 155*123*11cm | 191*96*11cm |
Accessories | Rope(4.2m) + Caribiner on end, ABS Grommet | |||
Load Bearing Weight | 1500Lbs |
4 spliced foam panels +3 Zippers | ||||
Open Size | 3650*1830*40mm | 4880*1530*40mm | 4880*1530*32mm | 3650*1830*32mm |
Foldable Size | 191*99*23cm | 155*123*17cm | 155*123*14cm | 191*99*13cm |
Accessories | Rope(4.2m) + Caribiner on end, ABS Grommet | |||
Load Bearing Weight | 2500Lbs |
2 spliced foam panels 3 spliced foam panels 4 spliced foam panels
FAQ:
Q1:Lead time for sample?
Generally, 3-5working days. If the sample is in stock, it will be shipped the next day.
Q2:Lead time for Mass Production?
If the goods are in stock, it will be shipped in the next few days as everything is confirmed.
Or the goods need to producing, lead time is 15-20 working days.
Q3:Do you accept OEM or ODM order?
Sure, OEM & ODM are our strong point. You‘re welcome to talk with us for OEM or ODM order. Only unexpected, not impossible!
Q4:What other water products could your company produce?
Kickboard, Saddle Float, Water Pad
Q5:Does air or foam float better?
Foam filled flotation is your best option if you're just getting started. Foam filled billets are typically a good choice for those building a floating dock on the land and moving into the water after building is completed.