EPDM Playground Rubber Granules Running Track Rustproof Outdoor Court Surfaces
Product Description
Running Track Athletic Track
13mm thickness all weather fully cast in site sandwich type polyurethane synthetic running track system equivalent to synthetic consist of 9mm thick resilient cushion layer of polyurethane (PU) Binder bonded with SBR granules by paving machine and red ethylene propylene diene monomer( EPDM) granules size 2-4mm sprayed to permanently embedded on top of SBR layer in accordance to IAAF requirement.
Quick detail
Place of Origin | Guangzhou, China |
Brand Name | Sdong |
Packed | Packing in Roll/ barrel /carton/ fiber bag |
Sport | Running track |
Type Item | prefabricated rubber running track |
Thickness | 9/11/13/15/18/20/25 MM |
Size | Width:1~1.25M, Length:10~20M |
Warranty | 12 Years Service Life |
Matrial | Environment rubber Elastic layer+environmental rubber wear layer |
Weight | 13-14KG/SQM |
Quantity of glue | 1.8 kg/SQM |
Base: | cement concrete / asphalt concrete |
Certificate | IAAF / ISO / LABOSPORT / CE / SGS / |
Advantage | Non toxic, fadeless, durable, seamless |
Benefits:
Full Pu Athletic Track Instructions:
Perfect integration with nature, only need to add a very small amount of water in the plastic, mix for 2 minutes evenly, spray on the base wait 24 hours to dry naturally, and then spray EPDM anti-skid surface twice, can be completed. Short construction period ,about 1 week.
Application Area
PU 4:1 Full-pu track material is used as a sandwich system which provides good force reduction and is construction on a casr in place basement of rubber crumb applied with clear PU binder, the base layer is sealed with a combination of rubber dust and two component PU material, with a final topping coating and EPDM rubber granule broadcast onto a flood coat of PU compound.
PU 4:1 Full-pu track material is also used as Full-PU system is a high performance system cast in place with two layer recycle SBR granule mixed with elastic PU flood coat and finished with a topping of EPDM rubber granule broadcast onto the PU compound.
Applications
Project photos:
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.