Exercise Recycled Rubber Outdoor Flooring Permeable Jogging Track Material
The full PU running track surface provides the longest lasting high performance, which full PU layered polyurethane bond poured-in-place track surface with an EPDM rubber embedded broadcast finish.
Process:
The cast polyurethane resin is prepared by mixing two components, one a liquid polyol and the other an isocyanate in correct proportions, add SBR granules and then blend at site to form a viscous liquid compound. Then spread on to the base of the track by paving machine, to the full thickness required. The liquid resin mix is then given a textured finish by broadcasting specially formulated colored EPDM rubber granules on the surface and allowing the polyurethane to cure. Following cure, the excess surfacing granules are removed. Finally go with the line marking.
Features:
. Two-component polyurethane provides excellent resilience and durability
. Embedded texture offers all-weather usage, excellent resilience and steady footing
. Layer of polyurethane mixed with EPDM granules for best comfort and shock absorption
. Well drainage and have stable performance in all climate conditions.
. Excellent strength and wearing resistance
Specification on Full Pour Running Track
Item | Index | Test Method |
Hardness (Shore A) | 45-60 | GB531 |
Tensile Strength | ≥0.7 | GB528 |
Elongation at break | ≥90 | GB528 |
Compress reversion | ≥95 | GB1684 |
Rebound Resilence | ≥20 | GB1681 |
Flame Retardance | Class 1 |
Our Services
Best service: Any inquiry will be replied in 24 hours. Timely and professional service all the time.
Best price: Reliable factory , direct selling,charming price for you!
Free sample: Provide free sample within 2kg, you just need to pay for the sample Express fee.
After-sale service: Provide free trainning lesson for our oversea distrubitor or buyer, professional
product & construction knowledge for you.
Some of the testing equipment utilized in the strict adherence to quality assurance for both raw materials and finished components include:
Running Track
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.