13mm Thickness Spray Coating Playground PU Glue Mix SBR Playground
Spray Coat Playground Surfacing Description
The Spray Coat running track system is a type of porous track. Porous track surfaces are designed so that water will
flow through the surface to the pavement below while allowing moisture to escape. In most cases the track will incorporate a porous asphalt sub base for the water to continue to rapidly move to a drainage system installed in an aggregate base.
Porous systems provide a cost effective solution to facility providers who wants to install a track facility for training and low level local competitions and the softer surface characteristics of porous surfaces make it an ideal solution for schools and community athletics clubs.
Packaging Details
Application:
Sports Court: Athletic track; Stadium, College, Training Center, basketball court, tennis court, volleyball court, gym and badminton court
Public Court: Theatre, Playground, School, Store department; Exhibition halls; Stairway; Workshop and parks
Others
Specifications
Product | Spray coating Playground Surfacing | ||
Thickness | 13 mm or customized | ||
Force Reduction | 39 | ||
Tensile Strength | 0.84 | ||
Elongation at break | 80 | ||
Modified Vert. Deform. | 1.9 mm @ 23°C [75°F] | ||
Friction | 0.64/48 | ||
Permeability | Impermeable | ||
Material | EPDM, SBR, Reclaimed Rubber, ETC. | ||
Features | Environmental-friendly, UV-resistance, 5--10 years service time | ||
Market | North America, Southeast Asia, Western Europe, Domestic Market | ||
Application | Outdoor Rubber Track, Playground Sports Flooring,etc. | ||
More Test Data | |||
Test Item | Reference | Standard Data | Test Result |
Tensile | IAAF | ≥0.5 | 0.84 |
Elongation at Break | IAAF | ≥40 | 80 |
Force Reduction | IAAF | 35-50 | 39 |
Vertical Deformation | IAAF | 0.6-2.2 | 1.6 |
Skid Resistance | IAAF | ≥47 | 57 |
Hardness Shore A | GB/T 14833-2011 | 45-60° | 45-55° |
Fire Rating | GB/T 14833-2011 | I Degree | I Degree |
Color Stability |
| Good | |
Chemical Resistance |
| Good |
Our Services
Best service: Any inquiry will be replied in 24 hours. Timely and professional service all the time.
Best price: Reliable factory , direct selling,charming price for you!
Free sample: Provide free sample within 2kg, you just need to pay for the sample Express fee.
After-sale service: Provide free trainning lesson for our oversea distrubitor or buyer, professional
product & construction knowledge for you.
Rubber Playground Surfacing
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less SBR granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.
Q11:What information do I need to provide to you before the product quotation?
A: Well, do you have any stadium projects on hand? Before the quotation, we need to know the project drawings, project area, photos of the basic ground, site photos, project types(Is it school type, competition land or leisure site and so on? In this way, we can recommend the relevant product pictures and brochures you need.), etc., to ensure whether the drawings are reasonable, to facilitate the verification of the situation, to make sure the accurate quantity of materials, and to provide a better and accurate quotation.
Q12: How about your delivery time?
A: For Crumb Rubber production, quantity under 50 metric tons, leading time is about 7 working days. Leading time of special color granules depends the quantity of order.
For PU Adhesives and PU Sport Flooring Material, quantity under five 20GP (about 50 metric tons), leading time is about 15 working days.
For the Preset Athletic Track Roll Material, quantity less than 10,000 square meters, leading time is 10 working days.
For the Artificial Grass Turf, quantity less than 10,000 square meters, leading time is 15 working days.
The sales of Sdong will keep in touch with you on every procedure. All the OEM order, the leading time should be confirmed with the sales.