All Weather Sport flooring IAAF Certified Sandwich System athletic Track
Permeable Floor Recycled Rubber Flooring Playground Surfaces Green Durable
The full PU running track surface provides the longest lasting high performance, which full PU layered polyurethane bond poured-in-place track surface with an EPDM rubber embedded broadcast finish.
spray track details :
Spray track Structure:103#Primer+ SBR layer+ pu top coat with EPDM + marking paint
Color:red, green or blue
Usage: School ,Stadium athletic running track
Thickness:13 mm
Main material: No 103 special glue primer,SBR,EPDM,pu top coat material
Auxiliary material:pu binder resin,hardener
Base:concrete base,asphalt base
demand of base:cement concrete/ asphalt concrete
Lifespan:6-10years
Plz contact me to get my best price ,thank you very much.
Specifications
Product | Track | ||
Thickness | 13 mm or customized | ||
Force Reduction | 41 | ||
Tensile Strength | 1.56 | ||
Elongation at break | 86 | ||
Modified Vert. Deform. | 1.9 mm @ 23°C [75°F] | ||
Friction | 0.64/48 | ||
Permeability | Permeable | ||
Material | EPDM, SBR, Reclaimed Rubber, ETC. | ||
Features | Environmental-friendly, UV-resistance, 5--10 years service time | ||
Market | North America, Southeast Asia, Western Europe, Domestic Market | ||
Application | Outdoor Rubber Track, Playground Sports Flooring,etc. | ||
More Test Data | |||
Test Item | Reference | Standard Data | Test Result |
Tensile | IAAF | ≥0.4 | 1.23 |
Elongation at Break | IAAF | ≥40 | 86 |
Force Reduction | IAAF | 35-50 | 41 |
Vertical Deformation | IAAF | 0.6-2.2 | 2.1 |
Skid Resistance | IAAF | ≥47 | 57 |
Hardness Shore A | GB/T 14833-2011 | 45-60° | 45-55° |
Fire Rating | GB/T 14833-2011 | I Degree | I Degree |
Color Stability |
|
| Good |
Chemical Resistance |
|
| Good |
Structure
2mm thickness EPDM color top layer plus 11mm thickness SBR rubber particle on the Bottom.
Features
1. Self developed and patented products, more eco-friendly and lighter in weight.
2. Cost effective: consumption of materials will cut by 10%-15%.
3. Lower maintenance and excellent after-sales services.
4. Tested by authoritative organizations and quality guaranteed.
5. More stable and longer service life in all weather conditions.
6. One-stop service available: from project design to construction abroad.
7. Customer oriented operating philosophy.
8. Contributes to energy conservation, environment protection, sustainable development and pioneers in industry.
Process:
The cast polyurethane resin is prepared by mixing two components, one a liquid polyol and the other an isocyanate in correct proportions, add SBR granules and then blend at site to form a viscous liquid compound. Then spread on to the base of the track by paving machine, to the full thickness required. The liquid resin mix is then given a textured finish by broadcasting specially formulated colored EPDM rubber granules on the surface and allowing the polyurethane to cure. Following cure, the excess surfacing granules are removed. Finally go with the line marking.
Applications
Because of its strong professional type and combined with expensive polyurethane raw materials, Full PU system track is generally used in special stadiums and some colleagues track and field and alpine regions in our country.
Applicable to all types of schools at all levels and professional stadium, athletics track, semicircle area, auxiliary area, fitness paths, indoor stadium training track, playground surfacing roads, indoor and outdoor track.
Running Track
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.