Tower Erection Tools Gin Pole is customized in section and length according to the tower height, tower weight, and tower type to be manufactured by Ningbo Lingkai.
Firstly, this Tower Erection Tools Gin Pole includes the aluminum alloy inner suspended gin pole, aluminum alloy inner suspended lattice gin pole, aluminum alloy lattice gin pole, A-shape tubular gin pole, and more.
Secondly, the aluminum alloy used is all the top 2A12, not the LY 12 material, in order to increase the safety factor to over 3.0, providing increased strength to withstand axial load and vertical load.
The Tower Erection Tools Gin Pole is a crucial piece of equipment specially designed for the efficient and safe assembly of towers in a variety of construction and telecommunications projects. Made from high-strength materials, this gin pole offers outstanding durability and stability, ensuring its ability to endure the challenges of heavy lifting and positioning tasks.
Its innovative design includes adjustable height settings, providing versatility in different tower configurations. The integrated pulley system enhances lifting capabilities, making it easier to maneuver heavy components into place. The gin pole is also equipped with safety features like locking mechanisms and reinforced attachment points, offering operators peace of mind during use.
Whether you are working on a telecommunications tower, wind turbine, or any other tall structure, the Tower Erection Tools Gin Pole is your reliable partner for achieving precision and safety in tower erection.
Aluminum alloy inner-suspension type gin pole (Lattice)
Item No. | Overall Length (m) | Side Length of Cross Section (mm) | Allowed Axial Load (KN) | Weight (kg/m) |
03121 | 10 | 250 | 23 | 10.5 |
03123 | 12 | 16 | ||
03124 | 13 | 13 | ||
03125 | 14 | 11 | ||
03126 | 15 | 10 | ||
03131 | 11 | 300 | 29 | 11 |
03132 | 12 | 24 | ||
03134 | 14 | 18 | ||
03136 | 16 | 13 | ||
03138 | 18 | 11 | ||
03142 | 12 | 350 | 33 | 13.5 |
03144 | 14 | 24 | ||
03146 | 16 | 19 | ||
03148 | 18 | 15 | ||
03151 | 12 | 400 | 43 | 14.6 |
03153 | 14 | 32 | ||
03155 | 16 | 25 | ||
03157 | 18 | 19 | ||
03159 | 20 | 14 | ||
03511 | 14 | 500A | 75 | 18 |
03513 | 16 | 64 | ||
03515 | 18 | 50 | ||
03517 | 20 | 41 | ||
03521 | 17 | 500B | 88 | 22 |
03523 | 19 | 70 | ||
03525 | 21 | 60 | ||
03527 | 23 | 52 | ||
03529 | 25 | 42 | ||
03531 | 17 | 600A | 75 | 20 |
03533 | 19 | 65 | ||
03535 | 21 | 55 | ||
03537 | 23 | 49 | ||
03539 | 25 | 41 | ||
03541 | 17 | 600B | 119 | 24 |
03543 | 19 | 104 | ||
03545 | 21 | 85 | ||
03547 | 23 | 70 | ||
03549 | 25 | 58 |
Tower Erection Tools Gin Pole customized are utilized for tower erection in overhead line transmission line construction. These Tower Erection Tools Gin Pole can be assembled piece by piece, and we will provide clients with accessories including double pulleys, nuts, screws, 2 sets of waist loops, bottom base, and head free of charge. Additionally, if technical support, video tutorials, or files are needed, we will make every effort to offer them.
Aluminum alloy derricks are used to assemble and erect towers and poles in transmission and distribution construction projects. This tool proves to be very advantageous and supportive to workers. The derricks are constructed using high-strength angle aluminum alloy, and all steel parts are galvanized for enhanced durability.
Product Customization Services for Tower Erection Tools
Brand Name: NBLK
Model Number: LBNX400, LBD400, LBNXG150
Place of Origin: NINGBO
Certification: ISO
Minimum Order Quantity: 1
Price: Get the latest
Packaging Details: Wooden case
Delivery Time: 3-7 days
Payment Terms: T/T
Supply Ability: 200 sets/month
Packing: Container
Max. Length of gin pole: 25 Meters
Main type: Inner Suspension Aluminum Alloy
Cross section: Max 700X700
Capacity: Max 600kn
Description: Gin poles for erecting tower, Emergency restoration tower, Tubular gin poles