Dual Direction Channels IC Carder Reader & facail recoginition acccess control flap turnstiles door
1. Technical parameters
Technical parameters | |
Housing material | 304 stainless steel |
Dimension | 1400*280*980mm |
Weight | 140Kg |
Lane width | 600mm |
Wing length | 285mm |
Wing thickness | 18mm |
Power | 24V DC |
Voltage | 220V, 230V, 240V, 110V, 120V |
Frenquency | 50/60Hz |
Communication interface | RS485 |
Input interface | Dry contact signal/12V signal/DC 12V |
Normal life-span | 3 million |
Transit speed | 40 persons/min |
Open/Close time | 2 sec |
Auto reset time | 10 sec |
Working environment | Indoor/outdoor |
Temperature | -10C to 50C |
Relative humidity | ≤ 90% no condensation |
2. Drive board description
Flap barrier drive board,air switch,power supply were included in a stainless box,fixed inside of the housing,box size is:350mm(L)*220(W)*65(H)mm,there are wiring posts on the box for drive board.
1-5 wiring posts for user input(for access control system etc);down end wiring posts for speed gate wing position detection inputs(connected),1-9 wiring posts for IR sensors dection inputs(connected)
3. About Mechanism
According to qty of the wing,it can be divided into one wing flap barrier and double wings flap barrier.One lane combined by 2 pcs one wing(single mechanism) flap barrier,two lanes combined with 2 one wing and 1 double wings (Mechanism)flap barrier.
Heavy-duty design for 24 hours continuous application,3 million times or above test.
High durablility with industrial parts. Runing is quiet without any noise&shock.
4. Maintenance
1.The housing of the equipment is of a sub-polish stainless steel,It is required to clean regularly with soft cloth so as to keep a clean and polish surface.It is forbidden to clean the surface with a hard object;otherwise,the appearance maybe affected.It is also forbidden to wash it with water,otherwise,short circuit may occur in the electric control system and the equipment may be damaged.Ensure that the power supply is disconnected before the inspection to avoid electric shock.
2. It is required to check regularly the connection of various movement sections of the equipment.Fasten timely the loose fasteners such as nut and screw,otherwise,turnstile failure maybe resulted due to long term cooperation.
3. It is required to check regularly the protection grounding of the system to ensure a reliable connection.
4. It is required to check regularly the connectors and line connection points to ensure a reliable connection.