Endless Nomex Drying Heat Press Felt Blanket for Sanforizing Machine
Product Name | Drying Felt Blanket for Sanforizing Machine |
Working Temperature | Nomex(Meta Aramid), Polyester, Acrylic,Wool Nomex 100% : 230℃ Polyester/Wool : 150℃ |
Advantage: |
|
Application:
Applicable to types of overseas and domestic sanforizer finishing machines for woven fabrics, such as Morrison, Monforts, Cibitex.
FAQ for Drying Felt Blanket for Sanforizing Machine
Q1: Quality Assurance
A1: We we have strictly test according to industrial standard.
All materials and finish products are in accordance with the industrial standards.
Q2: Price and Quotation
A2: Competitive Cost price. Warmly welcome to negotiate long term cooperation.
Q3: Lead Time and Freight
A3: Our factory is located in Shanghai, very near to Shanghai port and Shanghai Airport.
General delivery time is 5-8 days after payment/.
We can make delivery by DHL,FEX,UPS,TNT etc by air.
Q4: Terms of payment
A4:T/T payment in advance.for mass production, we can do 50%TT in advance, and 50%balance will be paid before shipping
Why choose us? our Drying Felt Blanket for Sanforizing Machine has below advantages.
ENDLESS
No seams or splices that may mark-off or weaken the felt.
Pre Heat-Set
Provides excellent dimensional stability and subsequent ease of tracking.
Superior Strength and Durability
Due to the high-tech and long staple fibers used in conjunction with the needling process.
Batt-on-Base Construction
An endless woven scrim (base) with a layered needled surface (batt)
FAQ
1: Is your product material environmentally friendly?
A: Our products are all environmentally friendly.
2: Can you accept free samples?
A: Yes, but you have to pay the courier fee.
3: Is it acceptable for small orders?
A: Yes, we accept small orders.
4: How to ensure product quality?
A: After you confirm the sample, we will produce the sample according to the quality control system. Before the shipment, our quality inspection staff will conduct a strict QC inspection.
5: How many days is your delivery time?
A: 7-15 days after receiving your payment, but negotiate according to the order quantity and production schedule.