Mold installation is conducted manually with details referring to Chapter 4 and Chapter 5. Installation steps are as follows:
Step 1: Adjust daylight between movable platen and stationary one to be larger than die height and make the movable platen at the position of mold open stop.
a) Press “Motor” to start pump motor;
b) Press “Mold adj. return” button to make daylight bigger than die height.
Step 2: Adjust the length and quantity to match it with the mold installed.
Step 3: Position the paired mold parts to the stationary platen with mold lifting bracket for the time being.
Machine Dimension | 5.3m*1.4m*1.9m |
Machine Weight | 5800 kgs |