BOTO 50L 60L 80L 100L 150L 200L Lab Electronic Temperature Semiconductors Chips Parts Thermal Shock Environment Test Chamber
Corresponding Standard
GB11158 GB10589-89 GB10592-89 GB/T10586-89 GB/T2423.22-2001 GB/T2423.1-2001 GB/T2423.2-2001 GB/T2423.3-93 GB/T2423.4-93 ASTM D1735 EIA - 364-59
IEC60068-2-1.1990 IEC60068-2-2.1974 IEC 68-2-30 IEC68-2-03 EIA - 364-31C
Technical parameters
| BT-XB-OLT-50 | BT-XB-OLT-80 | BT-XB-OLT-150 | BT-XB-OLT-225 | |
Inner size WxHxD(cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 |
|
External size WxHxD(cm) | 138x180x155 | 150X190X160 | 190x200X195 | 210x220X205 |
|
Shock Temperature ragne | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 90min | ||||
Temp recover time/change time | ≤5min / ≤10sec | ||||
Temp control accuracy/ distribution accuracy | ±0.5°C / ±2.0°C | ||||
Inner materials | SUS 304# stainless steel plate for inner chamber,and stainless steel plate + spray painting for external chamber. | ||||
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. | ||||
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. | ||||
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / hermetic two-stage compressor (air-cooled). | ||||
Safety devices | Fuse switch, high and low pressure protection switch compressors, refrigerant pressure protection switch failure warning system, electronic siren. | ||||
Fitting | Outlook window (special purchase), the upper and lower adjustable compartment two energized measured line hole, casters,level bracket. | ||||
Power | 3 phase AC108V-380V 50HZ/60HZ | ||||
Controller | Taiwan TATO or TH900C | ||||
Compressor | Germany Bitzer Brand |
XB-OLT-50 | XB-OLT-80 | XB-OLT-150 | XB-OLT-225 | XB-OLT-408 | |
Inner size WxHxD(cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 |
External size WxHxD(cm) | 138x180x155 | 150X190X160 | 190x200X195 | 210x220X205 | 225x250x220 |
Shock Temperature ragne | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 90min | ||||
Temp recover time/change time | ≤5min / ≤10sec | ||||
Temp control accuracy/ distribution accuracy | ±0.5°C / ±2.0°C | ||||
Inner materials | SUS 304# stainless steel plate for inner chamber,and stainless steel plate + spray painting for external chamber. | ||||
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. | ||||
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. | ||||
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / hermetic two-stage compressor (air-cooled). | ||||
Safety devices | Fuse switch, high and low pressure protection switch compressors, refrigerant pressure protection switch failure warning system, electronic siren. | ||||
Fitting | Outlook window (special purchase), the upper and lower adjustable compartment two energized measured line hole, casters,level bracket. | ||||
Power | 3 phase AC108V-380V 50HZ/60HZ | ||||
Controller | Taiwan TATO or TH900C | ||||
Compressor | Germany Bitzer Brand |
COMPANY PROFILE