HG 60 high frequency welded pipe mill line is used to manufacture welded steel pipe.After we absorbed advanced pipe making technology from both abroad and domestic, our innovative designed production line and each single unit of the production line is not only economical but also practical.
Pipe size: 25 - 60 mm Pipe thickness: 0.6 - 3 . 5 mm
⑴ Material Specifications:
Material | low carbon steel galvanize and crabon steel tube |
Mechanical properties | σb≤520Mpa,σs≤340MPa |
strip width | 100 - 190 mm |
strip thickness | 0 . 6 - 3 . 5 mm |
I.D of Coils | Φ 480 - 510 mm |
O.D of Coils | φ 1000 - 1600 mm |
Coil Weight | ≤ 4T |
⑵ Welded Pipe Specification
Pipe Diameter | Φ 25~ φ 60 mm |
pipe thickness | 0 . 6 - 3 . 5 mm |
Finish pipe length | 4 - 6 m |
Cut length accuracy | ± 3 mm |
Forming speed | 20 - 70 m/min |
⑶ workshop require : 100 m X 8 m ,at least 5m high
Notice:You can modify it according to the actual length of the workshop
1,Instruction Manual of Pipe Mill(provided at the time of a month before delivery time)
2,Inspection Certificate (provided at the delivery time)
3,Loading Order (Provided at the delivery time)
4,Layout Drawing (provided at the time of a month before delivery time)
5,Ground Base Drawing (provided at the time of a month before delivery time)
6,Electrical Principle Diagram
7,Overall Assembly Drawing of every unit of the line
8,Part Diagram of Vulnerable Parts
Before arrival of the equipment, technical service personnel shall be assigned to conduct on-site commissioning, maintenance services, provide guidance on commissioning, operation and maintenance of the equipment, and be responsible for technical training of the equipment operation and maintenance personnel on the demand side. Within 12 months from the date of arrival of the equipment, if the equipment is damaged due to the bad quality and the equipment cannot work properly, the manufacturer will give it repair or replacement free of charge if the equipment is in compliance with the rules of use, normal operation of the equipment and within 12 months from the date of arrival of the equipment.