Manufacturer Portable Ev Charging Station Electric Charger
technical parameter
technical parameter | |
Model | HY-ZY1-80 |
Machine output power | 7KW 11KW 22KW |
Input voltage | AC380V±15% |
AC input frequency | 50Hz |
Output voltage | 200~750VDC |
The maximum output current of the whole machine | 200A 300A 400A |
Maximum output current of single gun | 200A 250A 250A |
Single module rated power constant power | 20KW |
Number of module configurations | 4 6 8 |
Power factor | ≥0.98 |
Efficiency | ≥95% |
Power distribution mode | any full power for single gun / dual power distribution at the same time |
Communication Interface | Charging gun cable length 5 meters (customizable length) |
Metrology class | 0.5 |
Protection class | IP54 |
Cooling method | Air cooling (rear air) |
Working environment temperature | -25℃~55℃ |
Noise | ≤60dB |
Weight | ≤180KG (without module) |
Cabinet size(mm) | 625(W)*800(D)*1750(H) |
The Agency Policy
Please contact our sales department for more details.
After Sale Service:
The warranty of all our products is one year. The specific after-sale plan will be free for replacement or charging a certain
maintenance cost according to the specific situations.
.However, according to the feedbacks from markets, we seldom have after-sale problems because strict product inspections are
carried out before leaving the factory. And all of our products are certificated by top testing
institutions such as CE from Europe and FCC. Providing safe and guaranteed products is always one of our greatest.
introduce
Smart DC charger is a configurable-multiple-outlet high-power charger which is suitable for CBD or public areas.
*The product consists of human-machine interaction part, power module, internal control system, communication module and charging cable assembly.
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
A: FOB, CFR, CIF, DDU.
A: Generally, it will take 3 to 25 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.