Product Descriptio
Maintenance
Replacement steps
Release the hydraulic system pressure
Turn off the engine and pull all the operating levers several times to release the residual pressure.
Disconnect the power supply to ensure safety.
Remove the distribution valve
Gradually remove the hydraulic lines on the distribution valve and mark them to avoid wrong connections when reinstalling.
Remove the fixing bolts and carefully remove the distribution valve.
Check the installation loion
Clean the installation loion to ensure that no impurities enter the hydraulic system.
Check whether the pipes and joints are damaged or leaking.
Install the new distribution valve
Correctly connect the hydraulic pipes according to the original pipe connection method.
Replace the sealing ring to ensure good sealing.
Tighten the fixing bolts to avoid loosening.
Filling hydraulic oil
Check the amount of hydraulic oil and add hydraulic oil if necessary.
Start the engine, run at idle speed, and check for leaks.
Test run
Operate each action at low speed to check whether it is smooth.
Observe whether the pressure is normal and confirm that there is no leakage or abnormal noise.
Final inspection
Carry out a comprehensive inspection to ensure that all bolts are tightened and the pipes are connected correctly.
After ensuring that all operations of the excavator are normal, resume normal operation.
About Xinfeng Machinery (XF) parts:
Excavator Spare Parts
Swing Motor | Travel Motor | Fan Motor |
Swing Gearbox | Travel Gearbox | Relief Valve |
Gear Pump | Electrical Parts | Distribution Valve |
Engine Assembly | Final Drive Assy | Hydraulic Pump |
Advantages
Warehouse Display
Packaging and Delivery
FAQ
1.How to quickly and accurately buy products what lneeded?
A:Provide the original parts number to us to check.
2.How long have you been in the excavator
A:We are engaged in excavator parts since 1998
3.lfI don't know the part number,what shouldI do?
A:Please send us size and pictures of old products.
4.What is the warranty of the products?
A:The warranty is 6/12 Months based on the specific product.
5.How long is your delivery time?
A:The normal delivery time is 3-5 days for stock sproductsafter getting payment. lf not in stock, we will inform you thetime requlred.
6.Which shipping term you can supply?
7.What is your MOQ?
A:Small order and sample order are acceptable
8.Do you have any After-Sales service?
A:Yes!Our