Steel plate mesh for 50*100mm foundation pit supporting shotcrete
The steel plate mesh used for foundation pit supporting shotted concrete belongs to the light steel plate mesh in the diamond steel plate mesh series according to the thickness of the steel plate, and belongs to the 100 knife steel plate mesh in the light steel plate mesh series according to the aperture of the steel plate mesh, commonly known as slope protection steel plate mesh. Also known as rust-proof steel plate net, red paint steel plate net, foundation pit steel plate net, supporting steel plate net, shotcrete steel plate net, casting steel plate net, slope protection stretching net, slope protection expansion net, 2.0x50x100 steel plate net and other different names. In order to ensure the safety of underground structure construction and surrounding environment of the foundation pit, the retaining, strengthening and protection measures are adopted for the side wall of the foundation pit and surrounding environment. Slope protection steel plate mesh is for the definition of the foundation pit side wall spray concrete support used in a new type of steel reinforcement material is light, strong, tension resistance, convenient construction, low cost, compared with the traditional welding steel wire mesh, the tensile strength of slope protection steel plate mesh is three times of the welding steel wire mesh, the weight is only half of the welding steel wire mesh, Therefore, the price of slope protection steel plate mesh is far lower than the price of ordinary welding steel wire mesh. The slope protection steel plate mesh is light in weight, more conducive to construction, greatly saving the labor cost of the construction party and shortening the construction time.
Material: Q235 low carbon steel SPHC low carbon steel SPCC cold plate
Hole shape: diamond shape
Aperture: 50x100mm
Thickness: 2.0mm
Surface: Spray epoxy antirust primer, electric galvanizing
Production process: roll plate - opening - stamping stretching - leveling - surface anticorrosion processing - finished products - quality inspection - storage
Usage: Mainly used for all kinds of foundation pit supporting shotcrete, highway slope supporting shotcrete, district road hardening reinforcement reinforcement, roof pouring reinforcement reinforcement and other kinds of shotcrete support to strengthen tensile strength, prevent crack collapse.
SWD (Short Way of the Diamond) is the distance from the middle of the bond on one side to the middle of the bond on the opposite side.
LWD (Long Way of the Diamond) is the distance across the largest dimension of the diamond measured halfway between the diamonds.
SWO (Short Way of the Opening) is the width of the opening of the shortest side of the diamond. SWO does not include the strand width, where SWD (Short Way of the Diamond) does.
LWO (Long Way of the Opening) is the length of the opening of the longest side of the diamond. LWO does not include the strand width, where LWD (Long Way of the Diamond) does.
StrandExpanded metal is composed of strands and bonds. Strands form the sides of the expanded metal openings. .
Thickness is the measurement from the top surface to bottom surface of the expanded metal piece.
Main specifications and models of expanded metal mesh:
Specifications | |
Material | Low carbon steel, stainless steel, Aluminum Alloy |
Thickness | 0.5-8mm |
Strand Width | 0.3-9mm |
SWD | 2-56mm |
LWD | 3-150mm |
Panel Width | 4ft-8ft |
Panel Length | 4ft-10ft |
Opening Area | 45%-85% |
Hole Shapes | Square, Diamond,Triangle, Hexagonal, Round,Scale |
Surface treatment | Hot dipped Glavanized, Electric galvanized, PVC coated |
Colors | Could be made by RAL colors |
Packing | Iron or wooden pallet, wooden case |
FAQ:
A: We are factory. We are manufacturer of Wire Mesh .
A: Generally it is 5-10 days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=100000USD, 100% in advance.
Payment>=100000USD, 30% T/T in advance ,balance against copy of B/L.